| 1 | 11 KV Tension Clamp with Bail & IPC |
| 2 | Total (A) |
| 3 | LABOUR CHARGE |
| 4 | Chemical Earthing |
| 5 | Fabrication of steel |
| 6 | Excavation of Pit for Stay Set |
| 7 | Erection of Single SP-33 Pole |
| 8 | Erection of Single SP-55 Pole |
| 9 | Grouting of Pole |
| 10 | Muffing of pole |
| 11 | Dismantling of 11 KV Line (Weasel) |
| 12 | Painting of SP-33 Pole |
| 13 | Const. Inst. Of Danger Board/ Number Plate |
| 14 | Cartage SP-33 Pole, 0-20 Km |
| 15 | Cartage SP-55 Pole, 0-20 Km |
| 16 | Cartage of Petty Material, 0-20 Km |
| 17 | Headload Cartage SP-33 Pole (0-1 Km) |
| 18 | Headload Cartage SP-55 Pole (0-1 Km) |
| 19 | Headload Cartage of Material (0-1 Km) |
| 20 | Straightening of Tilted STP Poles |
| 21 | Back Cartage of Petty Material, 0-20 Km |
| 22 | Fixing of IPC with AL. Bail for Earthing |
| 23 | Jumper Section Pole |
| 24 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 25 | Fixing of 11 KV Suspension Ties |
| 26 | Fixing of 11 KV Mid Span Jointing Kit |
| 27 | Fixing of 11 KV IPC for Covered - Covered |
| 28 | Fixing of 11 KV IPC for Covered to Bare Conductor |
| 29 | Fixing of PP& Clamp with Nut & Bolt for SP-55 |
| 30 | Fixing of Disc Ins. For AAAC Conductor |
| 31 | Fixing of 11 KV Pin Insulator |
| 32 | Supply & Fixing of Anti Climbing Device |
| 33 | Renozzeling og Existing Stay Set |
| 34 | Laying Spreading, Stringing AAAC Condcutor |
| 35 | Looping and Chopping of Tree Branches |
| 36 | Total (B) |
| 37 | Total (A+B) |
| 38 | ACS Conductor Inderlok |
| 39 | Decentrlized Material |
| 40 | Holding Clmap for SP-55 with N/B |
| 41 | X ARM Holding Clamps for SP-33, N&B |
| 42 | Stay Clmap for SP-33 with Nut & Bolt |
| 43 | Earth Wire Clamp for SP-33 With N/B |
| 44 | 11 KV IPC for covered to covered conductor |
| 45 | 11 KV IPC for covered to bare conductor |
| 46 | 11 KV Mid span jointing kit |
| 47 | IPC with Aluminium bail for earthing 11 KV |
| 48 | 11 KV Sus. Ties/Cable Ties on Pin Insulator |
| 49 | 11 KV AL 59 ACS Cover Conductor |
| 50 | 11 KV Tension Clamp with Bail & IPC |
| 51 | Total (C) |
| 52 | LABOUR CHARGE |
| 53 | Erection of Earthing Rod |
| 54 | Fabrication of steel |
| 55 | Excavation of Pit for Stay Set |
| 56 | Erection of 11 KV Stay Set |
| 57 | Grouting of Stay Set |
| 58 | Excavation of Pit for Pole |
| 59 | Erection of Single SP-33 Pole |
| 60 | Erection of Single SP-55 Pole |
| 61 | Erection of SP-55 Double Pole |
| 62 | Grouting of Pole |
| 63 | Muffing of pole |
| 64 | Dismantling of 11 KV Line (Weasel) |
| 65 | Painting of SP-33 Pole |
| 66 | Painting of SP-55 Pole |
| 67 | Fixing of 11 KV XLPE Jointing Kit |
| 68 | Cartage SP-33 Pole, 0-20 Km |
| 69 | Cartage SP-55 Pole, 0-20 Km |
| 70 | Cartage of Petty Material, 0-20 Km |
| 71 | Headload Cartage SP-33 Pole (0-1 Km) |
| 72 | Headload Cartage SP-55 Pole (0-1 Km) |
| 73 | Headload Cartage of Material (0-1 Km) |
| 74 | Manual Shifting of 11 KV VCB O/G |
| 75 | Fixing of IPC with AL. Bail for Earthing |
| 76 | Jumpering of D/P TPMO, Fuse Set And T/F |
| 77 | Jumper Section Pole |
| 78 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 79 | Fixing of 11 KV Suspension Ties |
| 80 | Fixing of 11 KV Mid Span Jointing Kit |
| 81 | Fixing of 11 KV IPC for Covered - Covered |
| 82 | Fixing of 11 KV IPC for Covered to Bare Conductor |
| 83 | Laying Spreading, Stringing AAAC Condcutor |
| 84 | Cartage of 11 KV VCB O/G |
| 85 | Erection of 11 KV VCB O/G |
| 86 | Digging Trench for Lyaing U/G 11 KV Cable |
| 87 | Straightening of Tilted STP Poles |
| 88 | Looping and Chopping of Tree Branches |
| 89 | Total (D) |
| 90 | Total (C+D) |
| 91 | Grand Total (A+B+C+D) |
| 92 | Company/Firm Name |
| 93 | Name |
| 94 | Designation |
| 95 | Date |