|
| 1 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the useful materials for reuse and removing the debries within 50 meters lead complete as per direction of the Engineer-in-charge. |
| 2 | Removing old plaster from walls including raking oru joints 12mm deep and removing the debris within 50m lead. complete as per direction of the Engineer-in-charge. |
| 3 | Removing old grading plaster from roof slab, cleaning the surface, lowering and removing the debries within 50 m. lead. complete as per direction of the Engineer-in-charge. |
| 4 | Painting over roof surface 2 coats with damp proof paint of approved quality including cost of paint. complete as per direction of the Engineer-in-charge. |
| 5 | Supplying, fitting and fixing of M.S doors and windows shutters of approved design in proper position making good to the damges of walls of R.C.C or other structural etc. including mending or cutting sizes or grooves in chaukhats with cost, conveyance, taxes,etc.,complete, |
| 6 | Painting two coats with enamel paint of any approved shade including cost of paints etc. complete as per direction of the Engineer-in-charge. |
| 7 | 16mm thick cement plaster in (1:6) over brick masonary after racking out joints including watering for curing with all cost, conveyance and royalty of all materials etc. complete as per direction of the Engineer-in-charge. |
| 8 | 12mm thick cement plaster in (1:6) over brick masonary after racking out joints including watering for curing with all cost, conveyance and royalty of all materials etc. complete as per direction of the Engineer-in-charge. |
| 9 | 20mm th Cement plaster in C.M (1:6) to stone work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P etc. complete as per direction of the Engineer-in-charge. |
| 10 | Providing,fitting,fixing of false ceiling with aluminium anodised T Section No.3215 with including all fitting,cost of all materials,all taxes,labour, T&P etc.complete as per direction of the Engineer-in-charge. |
| 11 | Finishing surface of walls with cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging charges with cost of all materials taxes, labour T&P etc complete. |
| 12 | Distempering two-coats with any shade matrials including all cost, conveyance, taxes, royalty of materials, T&P articles required as per direction of the Engineer-in-charge. |
| 13 | Wall painting two coats with any approved quality of Water Proof Cement Paint over a coat of primingon new work to give an even shadeincluding cost of all materials,labour, T&p required for the work complete as per direction of the Engineer-in-charge. |