|
| 1 | Dismantling of existing EI Items such light fittings/ Ceiling / Exhaust fans / heavy duty wall mounting fans/ MCB Distribution Boards / Switch boards / MS conduits / GI Earthing strip / bus bars / Wiring and transporting by arranging vehiclefrom Alwal TE Bldg to Tirumalgherri Exchange as per engineer incharge direction i/c loading and unloading etc., as required. |
| 2 | Dismantling of Fuse cut out / capacitor box / DG changeover panel / LT Panel afterdisconnectingall incoming and out going working power cables and transporting by arranging vehiclefrom Alwal TE Bldg to Tirumalgherri Exchange as per engineer incharge direction i/c loading and unloading etc., as required. |
| 3 | Dismantling of smoke detection system / smoke detectors / hooters / MCPs/ MS boxes / 2core armoured copper conductor cables afterdisconnectingall incoming and out going cables and transporting by arranging vehiclefrom Alwal TE Bldg to Tirumalgherri Exchange as per engineer incharge direction i/c loading and unloading etc., as required. |
| 4 | Dismantling of 30kVA AVR afterdisconnectingall incoming and out going working power cables and transporting by arranging vehiclefrom Alwal TE Bldg to Tirumalgherri Exchange as per engineer incharge direction i/c loading and unloading etc., as required. |
| 5 | Dismantling of armoured power cables of various sizes connected between Fuse box / Energy meter / LT panel / DG set control panel, coiling and transporting by arranging vehiclefrom Alwal TE Bldg to Tirumalgherri Exchange as per engineer incharge direction i/c loading and unloading etc., as required. |
| 6 | ITC of existing1.5TR split AC unit, by fixing of Indoor unitonexistingwallandfixingofOutdooruniton existingstand/wallbracket,connectingrefrigerant pipes (BothVapourandLiquidlines) etc, asperthe Engineer in charge direction etc., as required . |
| 7 | Generalservicingof1.5TRsplitACunitsincluding Inverter and non inverter type removing of filter elementsandtopcovers,cleaningofcondenser,and evaporating coilswith waterjet spray blowing dust/ cleaningoffilters,checkingofconnections etc.,asrequired. |
| 8 | Topping up of refrigerant Gas charging for 1.5TR inverter type Split AC units with R410 refrigerant gas i/c pressure testing, leak arresting, Vaccumisation, purging with Refrigerant Gas etc., complete as required |
| 9 | Dismantlingof existing MS perforated / glasswool sound proof accoustic system from the wall surface / ceiling etc., by arranging welding machine with skilled labour and transporation of the same from TE Alwal to TE Tirumalgherri i/c loading and unloading etc., as required. |
| 10 | Dismantlingof existing 63KVA EA Set from the Engine bed, including disconnecting of power cables, earth strip connections, dismantlingexchaust MS Pipe line from the wall / MS angle iron structure of DG control panel etc., as required (Make : Kirloskar) |
| 11 | Shifting of existing 63KVA EA setfrom TE Alwal to Tirumalgherri TEalong with all Electrical Accessories including safe loading in Vehicle, Transporting by arranging hired vehicle, safe un-loading etc., as required. |
| 12 | Closing of exhaust fan / fresh air louvers with necessary GI including sealing the gaps with sealant to avoid rain water leakage including removing of exhaust fan/ louver and making good etc., as required |
| 13 | Providing minor civil works after dismantling of EI & Fans/ cables etc., that is closing of holes / providing cement masonary work etc., as required |
| 14 | Providng wiring for 2 nos. AC units with 3core 2.5 sqmm copper flexible cable with necessary clamping / interconnections testing in the existing BTS shelter of apprx. Siz 5x3 mtrs etc., as required |