|
| 1 | Gateway Supply, Installation, Testing & Commissioning of Smart Communication Manager Console with Gateway wireless inbuilt with Dual sim slot. Communicates with all the Modules collects the data and Transfers the data to the Server incuding providing of new portable UPS system not less than 650VA, with all required accessories, termination, dressing as per the instructions of EIC complete as per the scope of work, terms and conditions defined in the NIT document. |
| 2 | Supply, Installation , Testing & Commissioningof Console Gateway with Single SIM slot (Wireless) for Energy Meters / Load Managers complete as per the scope of work, terms and conditions defined in the NIT document. (10 points per Meter)- |
| 3 | Supply, Installation , Testing & CommissioningofModule Wireless for Breaker Status Monitring in Electrical panels [ up to 8 Breakers per Panel] complete as per the scope of work, terms and conditions defined in the NIT document. |
| 4 | Integration (soft with RS485/backnet/modbus) of Chiller Plant manager of AC Plant-1 with all mounting accessories and enclosures complete as per the scope of work, terms and conditions defined in the NIT document. |
| 5 | HVAC MONITORING SYSTEMSupply, Installation, Testing & Commissioning Smart HVAC Controller AX - 3 (Wireless) for AHU with all the mounting accessories included complete as per the scope of work, terms and conditions defined in the NIT document. |
| 6 | 1. AHU Start / Stop Command. 2. AHU Run Status Monitoring.3. AHU Auto / Manual/Bypass Status Monitoring.4. AHU Trip Status Monitoring. 5. Filter Status Monitoring.6.Supply Air Temperature Monitoring.7. Return Air Temperature Monitoring.8. 2 Way Modulating CHW Valve control.9. 2 Way Modulating CHW Valve Feedback monitoring.10. VFD Speed Command & Feedback monitoring11. DUCT PRESSURE TRANSMITER |
| 7 | Supply, Installation , Testing & CommissioningSmart Hvac Controller AX - 3 (Wireless) for AHU with2 PANEL and all the mounting accessories included complete as per the scope of work, terms and conditions defined in the NIT document.1. AHU Start / Stop Command. 2. AHU Run Status Monitoring.3. AHU Auto / Manual/Bypass Status Monitoring.4. AHU Trip Status Monitoring. 5. Filter Status Monitoring.6.Supply Air Temperature Monitoring.7. Return Air Temperature Monitoring.8. 2 Way Modulating CHW Valve control.9. 2 Way Modulating CHW Valve Feedback monitoring.10. VFD Speed Command & Feedback monitoring11. DUCT PRESSURE TRANSMITER |
| 8 | Supply, Installation, Testing & Commissioning Smart FAN Controller ModuleAX-1 (Wireless) for TERRACE FANS with all the mounting accessories included complete as per the scope of work, terms and conditions defined in the NIT document. 1.FAN Start / Stop Command.2.FAN Run Status Monitoring.3.FAN Auto / Manual/Bypass Status Monitoring.4.FAN Trip Status Monitoring. |
| 9 | CABLESSupply, Installation , Testing & Commissioningof all required cables for Power, communication and signal connections between the Module and the AHU/CSU/FCU or other devices and its panel along required PVC conduits/flexible as required and PVC cable trays as required to the controller/gateway system, with all required accessories, termination, dressing as per the instructions of EIC complete as per the scope of work, terms and conditions defined in the NIT document. |
| 10 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years): Academic-A: Chemical |
| 11 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years) : Academic-B: Civil |
| 12 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years) : Academic-C: Mechanical |
| 13 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years) : Old Dining hall |
| 14 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years) : AC Plant-1 for AD4 Circuit Secondary Pumps & Cooling Tower Motors |
| 15 | Total Cloud Charges for 3 Years (Will Be Applicable from Date of Handover For 3 Years) : HVAC Panel Breakers status & Energy meters monitering in the specified locations and as per the directions of EIC complete as per the scope of work, terms and conditions defined in the NIT document. |
| 16 | Sim Card Charges Per MonthNote:- For each Gateway 2 No SIM Cards are required . |
| 17 | PUMP MONITORING SYSTEMSupply installation, testing & commissioning of Smart RCS PUMP SWITCH CONTROLLER AND STATUSModule (Wireless) for RCS PUMP with all the mounting accessories included complete as per the scope of work, terms and conditions defined in the NIT document.1.Pump Start / Stop Command.2.PumpRun Status Monitoring.3.Pump Auto / Manual/Bypass Status Monitoring.4.Pump Trip Status Monitoring. |
| 18 | Supply installation, testing & commissioning of COOLING TOWER FANS STATUS MONITORING SYSTEM of AC Plant-1 with all the mounting accessories included and as per the directions of EIC complete as per the scope of work, terms and conditions defined in the NIT document.1.Pump Start / Stop Command.2.PumpRun Status Monitoring.3.Pump Auto / Manual/Bypass Status Monitoring.4.Pump Trip Status Monitoring. |
| 19 | SECONDARY PUMPS INTEGRATIONCHILLER PLANT SECONDARY PUMP CONTROL & MONITORING SYSTEMSupply installation, testing and commissioning of Chiller Plant Secondary Pump (Control & Monitoring) AX 05 Module for Chiller with all mounting accessories and enclosures including the commissioning and integration of VFDs of secondary pumps with all required accessories as per the instructions of EIC complete as per the scope of work, terms and conditions defined in the NIT document. 1. Differential Pressure Transmitter2. RS485 Port.3. 0-10V Output to control VFD4. Secondary Pump On Status5. Secondary Pump Trip Status |