| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Lime, moorum, building rubbish:1 km Unit:cum |
| 2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Earth:1 km Unit:cum |
| 3 | Earth work in excavation over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly dressed:All kinds of soil Unit:cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and:watering, lead up to 50 m and lift upto 1.5 m Unit:cum |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Foundations, footings, bases of columns etc. for mass concrete. Unit:sqm |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Unit:sqm |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Suspended floors, roofs, landings, balconies and access platform. Unit:sqm |
| 8 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Lintels, beams, plinth beams, girders, bressumers and cantilevers. Unit:sqm |
| 9 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Columns, Pillars, Piers, Abutments, Posts and Struts Unit:sqm |
| 10 | Extra for additional height in centring, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentring at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured):Suspended floors, roofs, landing, beams and balconies(Plan area to be measured) Unit:sqm |
| 11 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . :Thermo-Mechanically Treated bars. Unit:kilogramTMT BARS SHALL BE ISSUED FREE OF COST AT BHEL STORE. |
| 12 | Demolishing cement concrete including disposal of material within 50 metres lead : :1:3:6 or richer mix Unit:cum |
| 13 | Demolishing : R.C.C. work including stacking: of steel\" bars and disposal of unserviceable \"material within 50 metres lead: Unit:cum |
| 14 | Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 metres lead: :In cement mortar Unit:cum |