| 1 | Providing 4.5m long 300mm dia Single Under reamed Pile Foundation |
| 2 | Filling in foundation and plinth with sand well watered and rammed,etc. |
| 3 | Cement concrete (1:3:6) with 4cm size hard granite crusher broken metal,etc. |
| 4 | Foundation excavation in ordinary soiuk |
| 5 | Flyash Brick masonry in cement mortar (1:6) in foundation and plinth. |
| 6 | Flyash Brick masonry in cement mortar (1:6) in Superstructure,etc. |
| 7 | Flyash Brick masonry in cement mortar (1:6) in Superstructure,etc. |
| 8 | R.C.C.M-20PILE CAP |
| 9 | RCC M20 Plinth Band |
| 10 | RCC M20 Column & Beam |
| 11 | RCC M20 Lintel |
| 12 | RCC M20 Chajja & Roof Slab |
| 13 | Supplying,fitting & placing uncoatedHYSD bar reinforcement including all cost & carriage including labour charges,etc. |
| 14 | 6 mm.thick cement plaster in C.M.(1:4) for ceiling plaster including deep chiping,etc. |
| 15 | 16 mm thick cement plaster in C.M.(1:6) in internal surface of wall,etc. |
| 16 | 12 mm thick cement plaster in C.M.(1:6) in external surface of wall,etc. |
| 17 | Supplying fitting &fixing of MS Door & Window including all cost of material & Laour charges,etc. |
| 18 | Supplying fitting &fixing of PVC Door including all Cost & labour as per direction of E.I.C. (L.S.) |
| 19 | Supplying, fitting and fixing vetrifed tile in floors of size 600mm x 600mm of approved make conforming to IS :13755laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved qualityincluding cost of all work all materials,taxes,labour, T&P ,etc. complete as per direction of Engineer-in-charge. |
| 20 | Fixing the glazed tile cliding on wall over 12 mm thick C.P. (1:3) jointed with neat cement Slurry including cost of all materials, labour T&P etc rrequired for the work all completeas per direction of Engineer-in-charge. |
| 21 | Finishing walls with Oil \"bound cement primer one coat to plaster surfaces,etc. |
| 22 | Two coats of weather coat of approved quality to out side finishing area,etc. |
| 23 | Two coats of plastic emulsion paint of approved quality to in side finishing area,etc. |
| 24 | Provision for Display Board and Unforeseen items. |