| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 |
| 2 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } |
| 3 | S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 279 ( a). |
| 4 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etcall completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 5 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) |
| 6 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) |
| 7 | Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 |
| 8 | Supply and fixing 6 mm. (¼\") China white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and Tools and Plants.PWD SOR 2022 628 NEW ITEM |
| 9 | P/L vitrified tiles in different sizes for floor etc |
| 10 | Providing wall putty on new surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats.PWD SOR 2022 662 NEW ITEM. |
| 11 | Distempering (first coat) with oil bound distemperof approved brand and manufacture and ofrequired shade on undecorated wall surfacegive an even shade over and including a priming coat with cement primer of approved brand andmanufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also sand papered smooth includingsupply of all materials, labour, Tools & plants etc. required for proper completion of the work.PWD SOR 2022 649 + 650. |
| 12 | M.S iron work of small sizes and section such as holding down bolts etc |
| 13 | P/F 1mm thick MS sheet garge door with frame etc |
| 14 | GST |