Supply Installation, Testing Andcommissioning Of Air Washer System At Ew And A Building Supply Installation, Testing Andcommissioning Of Air Washer System At Ew And A Building , Supply Of Air Washer System At Ew&A Building , Supply Of Double Skinned Package Type Air Washers Of 15000 Cfm And External Static Pressure Not Less Than 50 Mm Made Of Hollow Aluminium Section , Puf Insulation ,Complete With Inlet Filters, Cel-Dek/Cellulose Based Media,Distribution System Consists Ofpvc Pipes, Frp Distributor, Pvc Mist Eliminator, Centrifugal Blower & Motor,Drive, Stainless Steel Tank, Brass Screen, Gi Casing,Etc. All As Specified And/Or Directed Etc., Complete. Note:The Existing Mono Block Pump Set With Isolation Valves In Suction And Discharge Lines, Nrv In Pump Discharge Lines, Y Strainer In Pump Common Suction Lines, Shall Be Used For The Commissioning Of The System , Supply Of Volume Control Dampers (Vcd) Forducts Made Of Gi Sheet Of Thickness Not Less Than 18 G Including Fittings, Gaskets, Nuts, Boltsetc.,All As Specified And / Or Directed Etc., Complete , Supply Of Fusible Link Fire Dampers Of Minimum 120 Minute Rating Made Of Gi Sheet Of Thickness Not Less Than 16 G Complete With Gi Casing, Gi Blades 150Mm, Spindles, Bushes Including Fittings, Gaskets, Nuts.Boltsetc.,All As Specified And / Or Directed Etc., Complete. , Installation, Testing & Commissioning Ofair Washer System At Ew&A Building , Erection, Testing And Commissioning Of Double Skinned Package Type Air Washers Of 15000 Cfm And External Static Pressure Not Less Than 50 Mm Made Of Hollow Aluminium Section , Puf Insulation ,Complete With Inlet Filters, Cel-Dek/Cellulose Based Media,Distribution System Consists Ofpvc Pipes, Frp Distributor, Pvc Mist Eliminator, Centrifugal Blower & Motor,Drive, Stainless Steel Tank, Brass Screen, Gi Casing,Etc. All As Specified And/Or Directed Etc., Complete. Note:The Existing Mono Block Pump Set With Isolation Valves In Suction And Discharge Lines, Nrv In Pump Discharge Lines, Y Strainer In Pump Common Suction Lines, Shall Be Used For The Commissioning Of The System , Erection, Testing And Commissioning Of Volume Control Dampers (Vcd) Forducts Made Of Gi Sheet Of Thickness Not Less Than 18 G Including Fittings, Gaskets, Nuts, Boltsetc.,All As Specified And / Or Directed Etc., Complete , Erection, Testing And Commissioning Of Fusible Link Fire Dampers Of Minimum 120 Minute Rating Made Of Gi Sheet Of Thickness Not Less Than 16 G Complete With Gi Casing, Gi Blades 150Mm, Spindles, Bushes Including Fittings, Gaskets, Nuts.Boltsetc.,All As Specified And / Or Directed Etc., Complete.