| 1 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST) |
| 2 | Jungle Clearance cutting heavy under growth and bushes upto 7.50 cm dia meter with collection and removal of roots with collection & Removal including all cost of material, labour, T&P etc. complete. |
| 3 | Dismantaling brick or stone masonry or cement concrete including stacking of dismantled material with in a distance of 60m. Including all cost of material labour T&P etc.required for proper completion of work. |
| 4 | Earth work in foundation of walls, Raft of Inlet etc.with disposal with in 30-m lead and 1.5 m. lift. in Mar, Kabar and Rankar soil. Including all cost of material labour T&P etc.required for proper completion of work. |
| 5 | Earth work in Excavation of canal bed for liniing work including all cost of labour material T&P etc. required for proper completion of work. |
| 6 | Earth Work in filling in Mar, Kabar, Ranker & Kanker Mixed Soil with all lead and lift including all cost of material labour T&P etc. required for proper completion of work. |
| 7 | Dewatering including all cost of material labour T&P etc. required for proper completion of work |
| 8 | Laying of Sand in foundation including all cost of labour material T&P etc. required for proper completion of work. |
| 9 | Laying P.C.C. 1:3:6with cement and course aggregate in nominal mix including all cost of labour material T&P etc. required for proper completion of work. |
| 10 | Centering and shuttering for P.C.C. work including of cost of shuttering. material and T & P etc. required. forproper completion of work. |
| 11 | Centering and shuttering for R.C.C. work including of cost of shuttering. material and T & P etc. required. forproper completion of work. |
| 12 | Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all material, labour T&P etc required proper completion of work. |
| 13 | Laying R.C.C. 1:1.5:3 cement concrete with 11.2 mm to 19 mm. Size graded hard stone grit and coarse sand in nominal mix by mechanical mixing in Inlet raft, wall and toe wall including cost of all material, labour and T&P etc. all leads and lifts for proper completion of work as per direction of Engineer-in-charge. |
| 14 | Laying C.C. 1:1.5:3 cement concrete with 11.2 mm to 19 mm. Size graded hard stone grit and coarse sand in nominal mix by mechanical mixing in lining sleeper including cost of all material, labour and T&P etc. all leads and lifts for proper completion of work as per direction of Engineer-in-charge. |
| 15 | Laying C.C. 1:2:4 cement concrete with 11.2 mm to 19 mm. Size graded hard stone grit and coarse sand in nominal mix in parapet coping and drainage crossing foundatiion including all cost of labour material T&P etc. requiredfor proper completion of work. |
| 16 | Providing and fixing P.V.C. pipe 100 MM dia in wing wall including all cost of material, labour and T&P etc. complete of work. |
| 17 | Providing and Laying of dry stone boulder pitching in drain and bed protection of drainage crossing weight not less than 25 Kg. including all cost of labour material T&P etc. requiredfor proper completion of work. |
| 18 | Supplying and laying of 900mm dia. R.C.C. hume pipe including all Carriage, loading, unloading, material, labour, T&P etc. complete of work. |
| 19 | Prepration of subgrade for lining work excluding cost of earth work. including cost of all material, labour and T&P etc. all leads and lifts for proper completion of work as per direction of Engineer-in-charge. |
| 20 | Laying of C.C. Lining 1:1.5:3 cement concrete with 11.2 mm to 19 mm. Size graded hard stone grit and coarse sand in nominal mix by mechanical mixing including all cost of labour material T&P etc. required. forproper completion of work. |
| 21 | Laying 125 micron polythene sheet including all cost of labour material T&P etc. required. forproper completion of work. |
| 22 | Construction joint of C.C. Lining with bitumen sealing compound.including all labour T&P etc. required for proper completion of work. |
| 23 | Laying two coat of bitumen sealing compound on top of sleepers of C.C. Lining works including all cost of labour Material T&P etc. proper completion of work. |
| 24 | R.C.R. Stone khanda Masonry 1:3 cement mortar in canal bed toe wall, wing wall and parapet including all cost of labour material T&P etc.required. forproper completion of work. |
| 25 | R.C.R. Stone khanda Masonry 1:3 cement mortar in canal bed toe wall, wing wall and parapet including all cost of labour material T&P etc but excludiing cost of stone khanda required. forproper completion of work. |
| 26 | Struck Pointing (Raised or Struck Deep on Stone masonry in Cement or lime) including all cost of labour material T&P etc.required. forproper completion of work. |
| 27 | Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) 6mm thick including all cost of material, labour, T&P etc. required. forproper completion of work. |
| 28 | Painting Two coat on wall including scraping old paint & cost of all material, labour and T&P required for proper finish of work. |
| 29 | Removal of Saturated (excluding cost of dewatering) in Mar, Kabar and ranker soilwith all lead and lift including all cost of material, labour, T&P etc. required. forproper completion of work. |