| 1 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST) |
| 2 | Jungle Clearance cutting heavy under growth and bushes upto 7.50 cm diameter with collection and removal of roots with collection & Removal including all cost of material, labour, T&P etc. complete. |
| 3 | Dismantaling cement concrete floor and brick/R.C.R. Masonary work including stacking of dismantled material with in a distance of 60m. Including all cost of material labour T&P etc. |
| 4 | Earth work in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. lift. in Mar, Kabar and Rankar soil. |
| 5 | Earth work in Excavation including all cost of labour material T&P etc. |
| 6 | Earth Work in filling in Mar, Kabar, Ranker & Kanker Mixed Soil with all lead and lift including all cost of material labour T&P etc. |
| 7 | Dewatering including all cost of material labour T&P etc. required for proper completion of work |
| 8 | Laying Coarse Sand in foundationincluding all cost of labour material T&P etc.required for proper completiion of work. |
| 9 | P.C.C. 1:3:6 nominal mix including all cost of labour material T&P etc. required for proper completion of work |
| 10 | Centering and shuttering for P.C.C. work including cost of shuttering. material and T & P etc. required. forproper completion of work. |
| 11 | Centering and shuttering for R.C.C. work including cost of shuttering. material and T & P etc. required. forproper completion of work. |
| 12 | Carriage cutting, beding, binding and placing Steel for reinforcement with cost of binding wire including cost of all material, labour and T&P etc. required for proper completion of work. |
| 13 | Laying R.C.C. 1:1.5:3 nominal mix by mechanical mixing. including cost of all material, labour and T&P etc. all leads and lifts for proper completion of work as per direction of Engineer-in-charge. |
| 14 | C.C. 1:1.5:3Nominal Mix with cement coarse sand and crushed hard stone grit in construction of sleeper (200x150)mm,Toe Wall and etc. including all cost of labour material T&P etc. required for proper completion of work |
| 15 | C.C. 1:2:4 Nominal Mix with cement coarse sand and crushed hard stone grit including all cost of labour material T&P etc. required for proper completion of work |
| 16 | Providing and fixing P.V.C. pipe 75 MM dia inclufing all cost of material, labour and T&P etc. complete of work. |
| 17 | Supplying and laying of 900mm dia. R.C.C. hume pipe including all Carriage, loading, unloading, material, labour, T&P etc. complete of work. |
| 18 | Prepration of subgrade for Lining work excluding cost of earth work. |
| 19 | C.C. Lining 1:1.5:3Nominal Mix with cement coarse sand and crushed hard stone grit including all cost of labour material T&P etc. required for proper completion of work |
| 20 | Laying 125 micron polythene sheet including all cost of labour material T&P etc. |
| 21 | Construction Joint of C.C. Lining with bitumen sealing compound including all cost of labour Material T&P etc. |
| 22 | Laying Two Coat of Bitumen sealing compond on top of sleepers of C.C. Lining works including all cost of labour material T&P etc. |
| 23 | R.C.R. Masonary with 1:3 cement mortar (cement and coarse sand) including all cost of labour material T&P etc. Reusable dismentled material cut stone boulder from item no.2 shall be used up to 20% from dismentled quantity if dismentled material found more than 20% usable shall be taken on stock as per direction of Engineer-in-Charge. |
| 24 | Struck Pointing (Raised or Struck Deep on Stone masonry in Cement or lime) including all cost of labour material T&P etc. |
| 25 | Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) 6mm thick including all cost of material, labour, T&P etc. complete. |
| 26 | Painting Two coat on wall including scraping old paint & cost of all material, labour and T&P required for proper finish of work. |
| 27 | Removal of Saturated (excluding cost of dewatering) in Mar, Kabar and ranker soilwith all lead and lift including all cost of material, labour, T&P etc. complete. |