| 1 | Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty) (Chap-04 251) |
| 2 | Earthwork in cutting or in embankment by manual mean in ordinary soil, excavation to be in the from of regular pits not exceeding1/2 meter (20\") depth and earth work in embankment to be in 20cm (8\") layers including ramming and dressing the surface to required level and slopes and also including 1.5 M(5\") lifts and 30M (100ft) lead.distanceas directed by the engineer-in-charge |
| 3 | Cement Concrete with 4cm gauge approved Stone ballast coarse sand and cement in proporation of 1:4:8 inculuding supply of all materail labour and T&P etc.required for proper completion. |
| 4 | M-150 brick work in 1:5 with one cement and Five course sand mortar in foundation or Sub structure including cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. |
| 5 | M-150 brick work in 1:5 with one cement and Five course sand mortar in Super structure including cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. |
| 6 | R.C.C work with cement approved coarse sand and 4 Cm gauge approved stone grit in proporation of 1:2:4 in R.C.C Raft foundation and footing excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 7 | R.C.C work with cement approved coarse sand and 2 cm gauge approved stone grit in proporation of 1:2:4 in R.C.C lighter beam having Spans upto 6mtr excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 8 | R.C.C work with cement approved coarse sand and 2 cm gauge approved stone grit in proporation of 1:1.5:3 in R.C.C coloum excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 9 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications complete as per MORTH IInd Revision 2019 Specification 1600. |
| 10 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply ofall material ,labour and T&P etc.required for proper completion of work |
| 11 | Mildsteel or iron work in heavy sizes such as trusses , builts up gates, door, frames record racks roof gate etc wrought to requriedfrom including drilling holes ,rivetting or welding where necessary and also including supply of steel bolts |
| 12 | Providing corrugated G.S sheet roofing including vertical/curved surface fixed with polymer coated J or L hook, bolts and nuts 8 mm diameter with bitumen and G.I limpet washers or with G.I limpet washers filled with white lead including a coat of approved dteel primer and two coats of approved paint on overlapping of sheets complete0.63mm thick with zinc coating not less than 275gm/m2 |
| 13 | Providing wall putty on new surfacewith approval quality material of Berger/JK/Birla or similar make 2 caots |
| 14 | Distempring two coat with oil bound distemper of approved brand and manufacture and required shade on undecorated wall surface to with an even shade over and including a primer coat with cement primer of approved brand and manufacture such as of british, shalimar asian paint after throughtly brushing the surface free from mortar droppings and other froeign matter and also including preparing the surface even and sand prepared smooth including cost of all materials. (Chap-15649) |
| 15 | Painting two coat over priming coat new steel and other metal surface after paint including preparing the surface by throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes fine steen/wood scrappers sand paparing and knotting including coat of all and supplyof all material ,labour and T&P etc.required for proper completion of work (Superior quality). Chap-15New item 1a+2+3(iii) |
| 16 | Supply & fixing 80 mm thick Precast cement concerete I-Shape interlocking paver block a with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) of O.P. cement, smooth high gloss finish, skid reditant. Manufactured from rubber moulds through vibro compression machanism the compressive strenght of concrere paver block shall not be less than 30MPA (M-30) and wight 5KG per no confirming to IS 15658-2006 with a 4 cm thick layer of fine sand including cost of material, labour, T&P Taxes etc. requried for proper completion of the work as directed by Enginner-in-charge.(1) Gray color |
| 17 | Providing and fixing of ACP sheet orclading work including writing letter including supply of all meterials,labour and T&P etc.reuired for proper complete of work. |
| 18 | ADD or Less Say Amount |