| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. |
| 2 | Cement Concrete in (1:2:4) M15 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 3 | Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 4 | Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 5 | Cutting, Bending, Binding & Placing in position ofsteel reinforcement (above 10mm dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc. |
| 6 | Centering & Shuttering for ordinary C.C workas required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 7 | Centering & Shuttering for all C.C workas required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 8 | Providing & Laying Porous cement concrete in 1:0:4 in Jhiris of C.C. Blocks including cost of all material, labour, T&P, etc.as per directed by engineer in charge completefor proper completion of work |
| 9 | Provide & Laying Boulder 40 to 70 kg.wt in bed & sides with all lead and liftincluding cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge. |
| 10 | Provide & Laying of Boulder (20 to 40 mm)for pitching in side slopes including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 11 | Provide & Fixing PVC water stop for expantion/ construction jointincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 12 | Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work. |
| 13 | Providing & Fixingsteel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 14 | Providing & laying of Local sandas back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 15 | Providing & laying of 2 to 4 mm thick Pea Gravel below CC Blockincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 16 | Providing & laying of 4 to 10 mm thick Stone Grit below CC Blockincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 17 | Provide & Fixing yearplate size (300mmx300mmx25mm) for completion of work or as Directed By Engineer in Charge. |
| 18 | Provide & Fixing B.Mplate size (200mmx200mmx25mm) for completion of work or as Directed By Engineer in Charge. |