|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of including carriage of mateirals in all leads and lifts as per directions of the Engineer-in-Charge. (G.S Sheet). |
| 2 | Structure steel work welded in built up section/ framed work , including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 3 | Providing corrugated C.G.I sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 0.63 mm thick sheet. (Through Rate) |
| 4 | Providing corrugated C.G.I sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 0.63 mm thick sheet. (Labour Rate) |
| 5 | Providing and fixing ridges or hips of width 60 cm(sixty centimetre)overallin plain with galvanised iron G.I Sheet fixed with galvanised iron coated J or L hooks, bolts and nuts 8 mm(eight milimetre) dia G.I. limpet and bitumen washers complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 0.63mm thick sheet. |
| 6 | Providing and fixing M.S. BP Sheet 2mm thick in eaves board. Facia/ soffits/ ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-Charge (Base members of steel work shall be measured & paid separately) |
| 7 | Removing dry or oil bound distemper, water proofing cement paint and the like by scraping and sand papering the wall surface smooth including necessary repairs to scratches completeincluding carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 8 | Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 9 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade (i) Old work (one or more coats) including carriage of materials in all leads as per directions of the Engineer-in-Charge. |
| 10 | Painting one coats(excluding priming coat) on previously paintedwood and wood based surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matters sand papering and stopping . including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) With white enamel paint |
| 11 | Painting one coat (excluding priming coat) on previously painted steel and other metal surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt,dust and other foreign matter including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) With white enamel paint |
| 12 | Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) or its equarlied on undecorated wall surfaces (two coats) to give an even shade and final finish after throughlyleaning the surface to remove all dirt, dust and other foreign matter etc.including sand paper smooth complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |