| 1 | Ezhuthil kulam waterbody rejuvenation at DIV 2 sakthikulangara |
| 2 | OD348774/2024-2025:Removing pola payal from the thodu and depositing on bank with initial lead and lift including disposal of polapayal 50m away from the site. |
| 3 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 4 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 5 | OD323612/2024-2025:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 6 | OD323614/2024-2025:Earthwork in or under water or liquid mud (manually/mechanically) including all charges |
| 7 | OD323613/2024-2025:Conveying excess earth from the site 5km by mechanical transport and deposited in low lying areas |
| 8 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 9 | OD364073/2024-2025:DR PACKING under foundation dry stone packing under foundation with good quality blastedrubble including conveyance of all materials labour charges etc as p[er direction ofdepartmental officers at site |
| 10 | OD364074/2024-2025:DRY RUBBLEMASONRY -Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost andconveyance of all materials labour charges etc complete as per direction of departmentalofficers at site |
| 11 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 12 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 13 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 14 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 15 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 16 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing |
| 17 | OD323616/2024-2025:providing and fixing of floating wetland. Making the floating wetland frame using 110mm PVC pipes, PVC fittings like equal Tee, elbow, etc and to be air tight. the frame to be covered with hydroponic sheet. the hydroponic sheet layer will protect plants roots from direct sunlight, capture falling organic matter and prevent weed colonization. lay the hydroponic sheet on top of the frame and use sea rope to secure the recover to the frame. locally native plants that grow well in water and will not grow too large for the floating wetland . the rate should include all materials, labour charges etc. complete (1.50* 1.40m). |
| 18 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work |
| 19 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 20 | 14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 21 | 14.46:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 22 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). |