|
| 1 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furniture\"s for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminium, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. |
| 2 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. ( To be carried out all working days) |
| 3 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean,neat and tidly with out any odour or foul smell (2 times in a day)Toilet |
| 4 | Water closets(IWC/EWC) |
| 5 | Urinals cleaning&providing scented urinal screen, |
| 6 | Wash basin |
| 7 | Supplying and transporting of portable water,filling in the sump once in three days including cost of water, transporting charges all leads lift etc., completed as directed by the engineer-in-charge |
| 8 | Supplying and transporting of packed drinking water cane ( 20 litres) 2 Nos per day for the use of Office staff including cost of water , Leads and labour etc., |
| 9 | Anti Termite Spraying using Chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 Litres mixed solution per 100 m2 once in 3 months to control Termite, Cockroaches, mites, Silver Fish, Cloth Moth, Spider, Ants etc.,Wooden portions will be mixed with concentrated chemicals or with Kerosene and as directed by the engineer at site ( 2 operations -every three month once ). |
| 10 | Mosquito Control for the entire building shall be carried out once in a fort-night and as directed by the engineer at site (12 services -2 servicesper every month) |
| 11 | Replacement of damaged or worn out plumbing fixtures with necessary adaptors. The rate includes the cost of all materials, labour, lead, lift etc., complete using the ISI Brand15mm dia CP taps ( Short Body |
| 12 | 15/12mm CP Pressing cock |
| 13 | CP coated pillar tap |
| 14 | CP Coated angle cock tap |
| 15 | 20mm dia GM Valve |
| 16 | 25mm dia GM Valve |
| 17 | Water Waste line hose |
| 18 | Flexible water connection hose |
| 19 | CP Coated Health faucet |
| 20 | Replacement of damaged or worn out Electrical fittings and accessories with internal wiring if any. The rate includes the cost of all materials, labour, lead, lift etc., complete using the approved quality with guarantee20W 4 feet LED fitting with LED |
| 21 | AC Exhaust Fan 300mm(12\") Sweep (Heavy duty) |
| 22 | 5 Amps Flush type switch |
| 23 | 16 Amps Flush type switch |
| 24 | Rodent control for the entire building shall be carried out once in a month as and when required including removal of dead rats daily, cleaning and spraying with chemicals and as directed by the engineer at site (6 Service -every month once ) |