| 1 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B. |
| 2 | Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as perstandard specification. |
| 3 | Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification. Upto Base |
| 4 | Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification. Above Base |
| 5 | Supplying fabricating and placing in position mild steel or ribbed steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete complying with standard specification |
| 6 | Cement concrete 1:11/2:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with CM 1:3 12mm thick and with kraft paper without claiming extra etc. as directed by the Departmental officers complete complying with standard specification. Upto Base |
| 7 | Cement concrete 1:11/2:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with CM 1:3 12mm thick and with kraft paper without claiming extra etc. as directed by the Departmental officers complete complying with standard specification. Above base |
| 8 | Brick work in Cement Mortar 1:5 (one cement and five sand ) using Country Bricks ground molded of size 22x11x7 cm. Including cost and conveyance of materials to site and all other labour charges as per standard specification.Upto Base |
| 9 | Brick work in Cement Mortar 1:5 (one cement and five sand ) using Country Bricks ground molded of size 22x11x7 cm. Including cost and conveyance of materials to site and all other labour charges as per standard specification. Above Base |
| 10 | Supplying and filling in foundation and basement with filling sand layers not more than 15 cm thick well rammed watered and not compacted complete complying with standard specification. |
| 11 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm metal in25mm Thick including cost & Conveyance of all materials & all labour charges etc complete complying with standard specification. |
| 12 | Finishing the top of roofwith one course of Machine Pressed Tiles of size 20 cm x 20 cm x 2cm of approved quality laid in CEMENT MORTAR 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, red oxide, etc., complete complying with standard specification. |
| 13 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. |
| 14 | Plastering in CEMENT MORTAR 1:5 12mm thick in Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification. |
| 15 | Supply of rolling shutter Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification. |
| 16 | Supply of Steel Doors Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification. |
| 17 | Supply of Steel Windows ,ventilaotors Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification. |
| 18 | Supply of Glazed Ventilator with 12mm Sq MS bar 0.90 x 0.30 (N-type) |
| 19 | Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580 x 440mm white glazed earthern ware of approved quality and brand with \"P\" or \"S\" trap conforming to BIS with crushed stone M.Sandcushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 (One lime, Two crushed stone M.Sandand Five brick jelly) 100mm thick and finishing the top to the required slope and including giving necessary connection to CI soil pipes (including the cost of 100mm dia CI pipe for a length of 600mm) by dismantling brick masonry wall / reinforced cement concrete roof / floor slab and making good the dismantled portion to the original condition with leakages etc., complete complying with standard specifications and as directed by the departmental officers.(The water closet should be got approved by the Executive Engineer before use on works). |
| 20 | Supply and Fixing of Cuddappa slab including cost and conveyance of all materials to site etc |
| 21 | EmulsionPainting two coat of Colour washing over wall plastering surface with best approved first quality of approved colour over the one coat of priming etc., complete complying with standard specification (The paint should be got approved by the departmental officers before use on works ) |
| 22 | Painting TWO coat of enamal paint new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specification. (The paint should be got approved by the departmental officers before use on works) |