| 1 | Construction of Public Distributor Shop in Pazhamukkal in T.Nallalam Panchayatat Marakanam Block |
| 2 | Earthwork excavation in all classes of soils except hard rock rerqurining blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidentail charges and sheeting, shoring.Km0/0-0/900 |
| 3 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. |
| 4 | Supplying and M SAND Filling inBasement withConveyed Gravel in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification |
| 5 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 6 | Below Basement |
| 7 | Above Basement |
| 8 | Supplying, Fabricatung and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete complying with standard specification |
| 9 | Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 10 | Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete . |
| 11 | Above Basement |
| 12 | Finishing the Top of Roof with one course of Pressed Tiles of size 23 cm x 23 cm x 2 cm laid incement mortor 1 : 3 mix and Pointingwith the same mortor mixed with water proof compoundincluding cost conveyance of all materials and labour charges etc complete |
| 13 | Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specificationas directed by the departmental officers |
| 14 | Plastering with Cement Mortor 1:3 ,20mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specificationas directed by the departmental officers |
| 15 | Special Ceiling Plastering and finishing all RCC exposed surfaces such as RCC Slabs,Canopies,sunshades,landing slab Beams ,etc with CementMortor 1:3, 10mm thick (one cement and three sand)including cost and conveyance of all materials and labour charges etc complete as directed by the departmental officers etc complete complying with standard specification. |
| 16 | Gronolthick floor finishand sizeshape and quality laid in Cement mortor 1 : 3 to 20 mm thick in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 17 | Paving the Wall and FloorScratch proof ceramic tiles CM 1 :2 , 20 MM Thick andPointing with White Cement 0.40 Kgper sqm mixed with colouring pigment to match the colour of the tiles including finishing the joints neatly complying with the standard specification and as directed by the departmental officers . |
| 18 | Dadooing walls with colour designed Glazed Tiles of sizes 300 mm x 200 mm x 6 mm size of approved make and quality and colour set in cement mortor 1 : 2 ( one cement and two sand ) over 10 mm base layer plastering and pointing with white cement neatly as directed . |
| 19 | Distempering two coat with priming coat and two coat with OIL BOUND Distemper over Cement plastered surface, ceiling and other new surface including cleaning preparing the surface etc, complete. |
| 20 | Distempering two coat with priming coat and two coat with OIL BOUND Distemper over Cement plastered surface, ceiling and other new surface including cleaning preparing the surface etc, complete. |
| 21 | Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc., |
| 22 | Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specifications and as directed by the departmental officers. |
| 23 | Supplying andfixing of Steel door , Windows ,Ventilaters and Etc Complete |
| 24 | Door D |
| 25 | Door |
| 26 | Windows |
| 27 | Ventilater |
| 28 | Rolling shutter |
| 29 | Labours charges for fixing the door including etc charges |
| 30 | Labours charges for fixing the Window including etc charges |
| 31 | Supply and Fixing of Cuddappa Slab |
| 32 | Cost of supply of Indian baby friendly water closet |
| 33 | Supply and fixing of 15mm dia brass co screw tap |
| 34 | Supply and fixing og 1000Liters for HPDE tank |
| 35 | Provision for sub estimate - Electrification |
| 36 | Provision for Stone wares es and specials |
| 37 | Provision for PVC pipes and specials |
| 38 | Provision for Nameboard & Photographic charges |
| 39 | Provision for Photographic charges |
| 40 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |