Tender For Construction Of Nrm Works Under Pmksy 2.0 Anicut, Pt, Mpt, Renovation Pt, Etc In Various Villages Of Ps Baseri - Dogbelling should be 5 to 7.5 cm. To depth (item no. 6b) GKN-2024 Forest clearing, including cutting of common vegetation and bushes (Item No. 191) GKN-2024 Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m.(BSR IRRIGATION 2023 Chapter-V Part B item no 22) J.C.B. Soil digging work, breaking of clods of excavated soil, sorting of grass & pebbles and section (in cut area) profile of bund by machine tractor with scraper. Loading and unloading initial lead 250 m. And lift 3 m. till . Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from date 01/02/2017) Unit 1 cubic meter. (Item No. 196B, GKN 2024) Transportation of soil over various distances including loading, unloading and stacking of material. (The length of transportation will be calculated from the nearest route and not by road) (1 KM) GKN 2024 ITEM NO 185 A, Compaction on Earth By manually or plain roller. (density 90% of Proctor) (BSR WRD 2023 Item No. 18 (a) Watering of earth including cost of carriage of water when source of water is Beyond 1 Km( BSR WRD 2023 Item no 28 (a) Excavation including loading diasposal and dressing of excavated earth within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required in all respect (c)Hard/Dense Soil (WRD BSR 2023, Chap-V, ITEM NO.1(b)) Pitching of hammered single stone 15 to 30 cm thick with all lifting and supplies. (GKN-2024 ITEM NO. 167) Supply of Dhaman grass seeds 1 kg/line per 100 m. (in 4 lines) (BSR 2021 FOREST DEPT. ITEM NO.19(7) Supply of Acacia seeds 2 kg/line per 100 m. (in 2 lines) (BSR 2021 FOREST DEPT. ITEM NO.19(3) Sowing of Dhaman grass seeds in 4 lines (GKN 2022-23 Item No. 159) GKN- 2024 Sowing of Acacia seeds in 2 lines (GKN 2022-23 Item No. 159) GKN-2024 Excavating soil up to 1.5 depth in the foundation, ditch, drain, compacting the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the empty spaces with soil again after filling the foundation and filling the remaining soil at a distance of 50 meters. dispose of till ordinary rock item 2d, GKN 2024 Item 2B in hard, clayey, gravelly soil, GKN, 2024 For anicut including pouring, compacting and leveling etc. in foundation of cement concrete ballast stone of 20 mm nominal size. 3 percent deduction will be made for not using 1:4:8 vibrator and mixer. (170 A), GKN 2024 of cement concrete 1:2:4 mix Pouring and supply of reinforced cement concrete, pressing into roof slabs, eaves, beams, lintels etc., leveling and leveling the surface with 1:3 cement mortar etc. including scaffolding but steel and shuttering priced separately. ITEM Stone masonry for anicut in cement-gravel mortar. (1:6) for W.H.S item no 166 (a), GKN 2024 RR stone khuranja in CM 1:6 of 23cm item no 149 (b), GKN 2024 Coping in 1:2:4 with stone crusher 50 mm thick Cement Concreet broken gritt 12 mm size including curring etc complete item no 14 (A), 25 MM thick Cement sand Plaster in C.M. (1:4) including curing etc complete item no 76 (a), GKN 2024 R.C.C. Supply of cutting, bending, fitting and binding of iron for work. Item 61, GKN 2024 RCC of centering shuttering (plank and frame). Installation for laying roof, slab, balcony, lintel etc. up to 4.5 meter height and removal etc. as per specifications. Shuttering Ply (Item 93B, GKN 2024) Earth work in harvesting, lifting 1.5 meter and digging 50 meter and installing dog well, installing camber, bed in hoda and leveling and leveling the dug soil. (Item 127B,GKN 2024) a) In Hard Soil