| 1 | Removingtheexistingcementplasterofanythicknesswithoutcausingdustnuisanceand stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. |
| 2 | DismantlingflatwoodenorA.C.Sheetceilingwithframeworkincludingstackingthe materials as directed with all leads, lifts etc. complete. |
| 3 | Providing waterproof plaster in W.C. and bath20 mm thick for dado in cement mortar 1:3 with neat finishing, floating using waterproofing compound at the rate of 1 Kilogram. per bag of cement of approved make and manufacturer and curing(and filling joints of Nahani trap andany outlet by properly) etc. complete. |
| 4 | ProvidingandfixinginpositionGypsum boardfalseceilingwith12.5mm thickGypsum boards, screwed/fixedtotheunderstructureofsuspendedG.I.Gridconstructedand suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum centertocenterdistanceof600milimetreperimeterchannelandintermediatechannelsat maximumcentertocenterdistance1200milimetregalvanizedgridshouldbefixedto reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws.The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels.Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed inall respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. |
| 5 | Providing andapplying Twocoats ofwall care Putty onplastered surface andCeiling and Walls to prepare surface even and smooth of approved make, etc complete. |
| 6 | Providing and applying plastic emulsion paint of approved quality, colour and shade to old andnewsurfacesintwocoatsincludingscaffolding,preparingthesurface.(excludingthe primer coat)etc. complete. |
| 7 | Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 8 | ProvidingandfixingP.V.C.Rainwaterpipesof160mmouterdiameterandhavingwall thicknessof2.2to2.7mmconfirmingtoI.S.13592-1992includingproperrainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket withsolventcementandproperlyrestingtheshoeofpipesonC.C.ormasonryblocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. |
| 9 | Providing,layingandfixingP.V.C.pipeof50mmdia.withfittingssuchasbends,tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. Including removingexistingpipelineifnecessaryandconveyingandstackingthesameinPWD chowky or as directed etc. complete. |
| 10 | Providing,layingandfixingP.V.C.pipeof75mmdia.withfittingssuchasbends,tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. Including removingexistingpipelineifnecessaryandconveyingandstackingthesameinPWD chowky or as directed etc. complete. |
| 11 | Transportation of material obtained from debris of various sorts excavated stuff including necessary excavation/ loosing including loading, unloading and conveying and disposing as directed.( Beyond 10 Km. ) |
| 12 | Providing royalty charges against royalty paid by the contractor to the Revenue department for supply of different construction material for which royalty is necessary. Natural Sand |
| 13 | Testing Charges for Conducting BASIC TEST OF CEMENT.Standard ConsistancyFineness, Specific Gravity,Setting Time ( Initial & Final ), CompressiveStrength, Soundness etc. complete. |
| 14 | Testing Charges for Conducting BASIC TEST OF FINE AGGREGATES. Fineness Modulus ( Sieve Analysis ),Silt & Clay Content |