| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.(i) Lift up to 1.50 mtr. |
| 2 | (ii) Lift up to 1.50 mtr.to 3.00 Mtr |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix:1:4 (1 cement : 4 fine/ coarse sand) |
| 7 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Cold Twisted Bar. |
| 8 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 9 | Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. HD-20 |
| 10 | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer.200mm dia NP2 |
| 11 | Carriage of sand/earth including loading and unloading etc. with Lead up to 2.00 KM |