Name of Work: -Flushing of Various UGR’s of different capacity of booster pumping stations in Madipur constituency
Sl. No.
Item Description
1
Flushing, Cleaning &Chemical Treatment of UGR’s up to 50,000 gallon capacity by Bleaching process:- A. Dewatering of muddy water, after mixing of mud/silt in residual water of UGR with the help of phawra, belcha and required man power and dewatering of muddy water from UGR by hiring of pump set, panel, pipe, hoses, cable and all required tool and tackles. Making arrangement for lightning, safety equipments. Scrubbing of walls, roof, floor with the help of brush and broom, collecting and taking out unwanted material, mud, silt from UGR etc. B. Spraying of chemical solution on wall, floor and roof. The work includes regulations of valves, replacement of ventilator jalli, painting and mentioning dates of flushing. The chemical will be provided by the firm. C. All safety precautions will be taken by the firm & firm will provide all safety gears during execution of work such as hamlet, gum boots, safety belt, oxygen cylinders / mask etc. D. All safety and lighting arrangement should be displayed & installed one day before the scheduled notification, in case the firm fails to compliance the condition and the schedule in forced difered heavy penalty shall be imposed. Name of Site:- 1. 204 / 240 Madipur2. 748 Shivaji Enclave3. 144 ST Raghubir Nagar4. 552 (Slum) Madipur
2
Flushing, Cleaning &Chemical Treatment of UGR’sup to 1,00,000 gallon capacity by Bleaching process:- A. Dewatering of muddy water, after mixing of mud/silt in residual water of UGR with the help of phawra, belcha and required man power and dewatering of muddy water from UGR by hiring of pump set, panel, pipe, hoses, cable and all required tool and tackles. Making arrangement for lightning, safety equipments. Scrubbing of walls, roof, floor with the help of brush and broom, collecting and taking out unwanted material, mud, silt from UGR etc. B. Spraying of chemical solution on wall, floor and roof. The work includes regulations of valves, replacement of ventilator jalli, painting and mentioning dates of flushing. The chemical will be provided by the firm. C. All safety precautions will be taken by the firm & firm will provide all safety gears during execution of work such as hamlet, gum boots, safety belt, oxygen cylinders / mask etc. D. All safety and lighting arrangement should be displayed & installed one day before the scheduled notification, in case the firm fails to compliance the condition and the schedule in forced difered heavy penalty shall be imposed. Name of Site:- 1. 444 (LalQtr) Madipur2. 208 (SFS) Madipur
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.