| 1 | PART A.Supply of Man Power for Routine operation andMaintenance of HVAC and AHU system |
| 2 | Supply of One number of Technical assistant Grade II ( Diploma in AC Refrigeration) with minimum of three years in building maintenance on monthly salary basis including the cost of ESI, EPF , uniform dress , ID card , toolsand other safety materials for safety measures |
| 3 | Supply of one numbers of Technical assistant Grade III ( ITI in AC Refrigeration) with 3 year experience, on monthly salary basis including the cost of ESI, EPF , uniform dress , ID card , toolsand other safety materials for safety measures |
| 4 | Supply of One numbers of Mechanic class I with an experience of 3 years in AC mechanic , on monthly salary basis including the cost of ESI, EPF , uniform dress , ID card , toolsand other safety materials for safety measures |
| 5 | Supply of ONE numbers of Cleaner class II with three year experience in AC regulating and repairing system on monthly salary basis including the cost of ESI, EPF , uniform dress , ID card , toolsand other safety materials for safety measures |
| 6 | Supply of uniform and other tool and safety measures |
| 7 | Part B :Break down Rectification and Replacement including cost of material and spares |
| 8 | Break down Rectification and Replacement including cost of material and spares towards HVACmotars and AHU motorscoiling(Total)-12 months |
| 9 | Supply installation testing commissioningof newCondensor fan motors(2.2kW) of Hindustan make |
| 10 | Removing of existing fan motor(2.2kW) of Hindustan makeand rewinding, refixing of the same, etc |
| 11 | Rewinding of 40 HPPump Motor(Secondary motor) and overhauling including transporation ,etc |
| 12 | Rewinding of 30HP(Primary motor)Pump Motor and overhauling including transporation ,etc |
| 13 | Rewinding of AHU motors 7.5kW including installation and labour charges,etc |
| 14 | Supply of start delta starter for 40 HP motor |
| 15 | Supply of start delta starter for 30 HP motor |
| 16 | Break down Rectification and Replacement including cost of material and spares towards Replacement of of fan blades ( total available fan is 36) and 150 TR compressor repairs(Total)-12 months |
| 17 | Supply installation testing commissioning of Condensor fan blade |
| 18 | Charges for 150TR Screw Compressor re winding and bearing replacement |
| 19 | Removal of compressor and shiting, unloading, transportation and re fixing, etc |
| 20 | Break down Rectification and Replacement including cost of material and spares towards oil sensor , thermostats , temperature sensor , gas breaker, mother board repair and other maintenances(Total)-12 months |
| 21 | Supply and fixing of Oil Sensor |
| 22 | Supply installation testing commissioning of New MCS / PCB Board including programming |
| 23 | Supplying and fixing of newDisplay with Key pad for MCS board |
| 24 | Supplying and repairing of existing Mother Board/MCS board with programming |
| 25 | Supplying and repairing of Mother Board/MCS board withoutprogramming |
| 26 | Supplying and new SlaveBoard(SI board) |
| 27 | Repairing of Slave board including all charges |
| 28 | Supply installation testing commissioning Motor protector relay |
| 29 | Supply and fixing of new Refriegrant drier ( 2 parition ) and removal of old |
| 30 | Supply installation testing commissioning of Suction and discharge line temperature sensor |
| 31 | Supply installation testing commissioningof Suction and discharge pressure transducer |
| 32 | Oil Replacement & Re filling |
| 33 | Supplying of Refrigerant 134A Gas |
| 34 | Supply and fixing of Water flow swtich |
| 35 | Supply and installation of modulating typeelectronic actuator for suitable pressure independent Balancing and control valve |
| 36 | Supply and installation of indicating -dial type pressure guage |
| 37 | Supply and installation of thermometre |
| 38 | Supply installation & testing commissioning of Pump suction guide with integral stainer shall be selected suitable to suit the pump suction diameter with necessary accessories like flanges ,fasteners ,etc complete (Chiller and Pump) |
| 39 | Supply installation & testing commissioning of Pump suction guide with integral stainer shall be selected suitable to suit the pump suction diameter with necessary accessories like flanges ,fasteners ,etc complete (AHU) |
| 40 | Part C :Service Charge for the agency |
| 41 | Service Charge for management agency |