| 1 | Site Clearance. As per SI No. 258 |
| 2 | Earth work in cuttng in ordinary soil Including laying and ramming of bottom and disposal tc all complete. |
| 3 | E/w in excavation in foundation in ordinary soil including all required complete for proper completion of work as per S.I. no 251. |
| 4 | Providing and laying cement concrete 1:4:8 mix (1 cement,fine sand,graded brick aggrigate 40 mm)including supply of all material labour t&p etc for proper completion of work. As per si no 275 |
| 5 | RCC. work with cement approved coarse sand andapproved stone grit in the proportion of 1:1.5:3 lighter beams excluding reinforcement and its binding but including its fixing and binding the same with 24 B.W G.G.I. binding wire and including necessary centering and shuttering etc.including supply of all material labour t&p etc for proper completion of work. As per si no 285 |
| 6 | R.C.C. work wilh cement approved -çoarse sand and approved stone grit in the proportion of 1:1.5:3 In for slab excluding supply of reinforcement and binding but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc and also including supply of l materials, labour and T&P elc. required for proper completon of the work as per si no 284 |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm guage approved stone ballast in the propporation of 1:1:5:3 ) inCOLUMNexcluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I binding wire and inculding necessary centering and shuttering etc. and also including supply of all materials, labour adn tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. As per si no 289 |
| 8 | MS Steel or iron in plain work such as reinforced aggregate or reinforced brick work (when not included overail rales) wrought |lo required shape,as necessary including bending for proper completion of work and including supply of steel it_ westages all incomplete as per si no 504 |
| 9 | M150 class brick work in 1:4 cement and c/sand and mortar in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work.As per si no 5410 |
| 10 | Providing and laying25 mm thick DPC work as 1:1.5:3 cement, coarse sand, s grit with composition powder atc all complete as per S.I. no 361 |
| 11 | M150 class brick work in 1:4 cement and c/sand mortar including supply of all materials, labour, tools and plants etc. required for proper completion of the work.IN SUPERSTRUCTURE as per S.I. no 305a,309,310 |
| 12 | M.S. or iron work of heavy size in angle iron door and window frame i/c cutting welding and wastage i/c supply of all material labour t&p etc.required for proper complition of the work as per si no 503 |
| 13 | 20 thick plaster with cement mortar in proportion of 1:3 cement and coarse sand and b/w etc all complete as per si no 597 |
| 14 | Dado plaster with 1:2 finished with a coat of neat cement coat with etc all complete |
| 15 | (25 mm thick CC flooring 1:2:4 plain cement concrete floor with içement, approved coarse sand and 20 mm gråded approved |stone laid in panels fumished with 3. mm foatin coat of nealt |Cemeni or cement and marble dust in 5:1 as specined\" over and jincluding 75 mm thick base concrete consisting of cement, local sand and brick ballast 40 mm quage In proportion of 1:4:8 and /temoving ay over mortar at the jolns of the panel if any and bring them a unifom finish including supply all matenials, labour and T&P elc requlred for proper completion of the work as per SI no. 601 |
| 16 | s/f of main hole cover with fixing etc all done |
| 17 | P&L of Kajariya Tiles with 20 mm thick base mortar 1:2 mix (Cement, c/sand) etc complete as per SI no. 14.07 |
| 18 | Providing and applying white cement based putty of average 1mm thickness of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth) |
| 19 | finishing walls with water proofing cement paint of approved brand and quality on new work With three coats to give and even shadow i/c supply of all materials labour and t&p etc. as per SI no. 660 & 661 |
| 20 | Painting 1st coat over priming coat on steel superior synthetic enamel to give even shade including cleaning of surface each one coat priming coat of all materials labour etc required all proper completion of work as per SI no. 641 & 642 |
| 21 | s/f of wooden work in panel as door and window etc all complete as per SI no. 411 |
| 22 | s/f of wooden work in panal as door and window etc all complete as per SI no. 422 |
| 23 | p/l of corrugated G.S. sheet roffing including bolt and coated approved primer one coat and two coat enaimel paint etc all complete as per SI no.536 |
| 24 | P/L of c.c. work in 1:2:4 cement ,c sand and s/grite etc all complete as per SI no. 279A |
| 25 | S/L/R/C of G.S.B. stone grite with consolidation of dust and water etc all complete as per RMR |
| 26 | 80mm thick pavert interlocking tile rubber moulded including fine sand coussning and making camber in road etc all included |
| 27 | s/f barbed wire around boundary wall etc all complete |
| 28 | s/f of w.c. pan |
| 29 | s/f of cistern |
| 30 | s/f of m.s. bracket pair |
| 31 | s/f of urinal pan |
| 32 | s/f of galy trap |
| 33 | s/f of wash basin |
| 34 | s/f of 110 mm dia pvc pipe down pipe |
| 35 | s/f of 15mm dia G.I. pipe ISI Mark |
| 36 | s/f of 25 mm dia G.I. pipe ISI Mark |
| 37 | s/f of G.I. Tee 15mm dia |
| 38 | s/f of G.I. Elbow 15 mm dia |
| 39 | s/f of G.I. Socket 15mm dia |
| 40 | s/f of G.I. Tee 25mm dia |
| 41 | s/f of G.I. Elbow 25 mm dia |
| 42 | s/f of G.I. Socket 25mm dia |
| 43 | s/f of brass stope cock |
| 44 | s/f of G.I. long Screw 15mm dia |
| 45 | s/f of G.I. long Screw 25mm dia |
| 46 | s/f of C.P. piler cock |
| 47 | s/f of submersible pump 1.5 H.P. with 110 mm dia boring with installation of water storage tank etc all complete |
| 48 | later writing with enamel paint etc all complete |
| 49 | s/f of wiring point for light point fan box switch socket with 1 sqmm copper wire board with labour work complete |
| 50 | s/f of G.I. pipe and fitting and sewar system etc all complete |
| 51 | Disposal / cartage of earth up to 4km distance loding and unloading included etc. all complete |
| 52 | s/f of higt mast with pole including all lbaour T&P |
| 53 | s/f of Bio gas plants including all material and installation etc all complete |
| 54 | s/f of Name board with fixing b/w platform etc all complete |
| 55 | Add 18% GST |