Tender For Reconstruction Work Of Damaged Concrete Structures Built On Parchal Escape In Hardoi District - E/W In Makingroad Diversion & Bund Inescape By Any Means Lead Up To 30 M & Lift Upto 1.5 M Manual Compaction And Dressing Etc.All Work Done As Per D, hardoi-Uttar Pradesh

Irrigation Department has published Tender For Reconstruction Work Of Damaged Concrete Structures Built On Parchal Escape In Hardoi District - E/W In Makingroad Diversion & Bund Inescape By Any Means Lead Up To 30 M & Lift Upto 1.5 M Manual Compaction And Dressing Etc.All Work Done As Per D. Submission Date for this Tender is 19-11-2024. Dam Work Tenders in hardoi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

46157687
Tender For Reconstruction Work Of Damaged Concrete Structures Built On Parchal Escape In Hardoi District - E/W In Makingroad Diversion & Bund Inescape By Any Means Lead Up To 30 M & Lift Upto 1.5 M Manual Compaction And Dressing Etc.All Work Done As Per D
Open Tender
NCB
Uttar Pradesh
Hardoi
19-11-2024

Tender Details

Reconstruction work of damaged concrete structures built on Parchal Escape in Hardoi district - E/W in MakingRoad diversion & Bund inEscape by any means lead up to 30 M & lift upto 1.5 M manual compaction and dressing etc.All Work done as per direction of Engineer-in-charge. For vrb at Km 0.740, 3.467, 8.225 2 Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead. All Work done as per direction of Engineer-in-charge. For vrb at km 8.225 3 Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead .All Work done as per direction of Engineer-in-charge. For vrb at km 3.467, 8.225 4 Demolishing brick work in Lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge For vrb at km 3.467 5 Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. For vrb at km 8.225 and inlet no,1 and inlet no 2 6 Earth work in strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no 1 7 Hiring & engaging Diesel Pumpof 5 H.P. with POL For Dewatering at site.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 8 E/w in cutting in foundation of box Culvert / Guide wall on channelsincluding lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone 9 Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 10 Laying Plain CementConcrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. (Cement- Ultratech/ A.C.C / J.k super /Birla ) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, 11 Laying Plain CementConcrete (M -10) in foundation 1:3:6 with stone grie including cost of material, labour, T&p etc, complete.(Cement-Ultratech/ A.C.C / J.k super /Birla )All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone 12 Laying Reinforced CementConcrete( M25 ) in Raft , Abetment , Piers,slabetc. in withSuperplasticizer (Admixture) using Cement (Ultratech/ A.C.C / J.k super /Birla (43 grade)) withCoarse Sand & 10 mm - 20mmKabrai stone Aggregate by using batching plant transit mixer & Concrete pump including cost of all material, labour, T&p etc, complete. All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone 13 Bending,Binding,Cutting and Placing in position reinforcement ( TATA / SAIL / JSW) including all cost of labour and material T&P etc. required for porper completion of the work/MT.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225,Km stone, cb stone 14 Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone 15 Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of allmaterial, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 16 Class 150 Brick work in 1:4 CMincluding 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. (Ultratech/ A.C.C / J.k super /Birla) All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2 17 Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of allmaterial, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 18 Providing & Fixing Bitumen Joint filer Board For Expansion Joints. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 19 12 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 20 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2 21 Dry brick on end pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225 22 Dry brick on Edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 23 Supplying & Laying 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender.The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposureand should be inert to biological degradation and resistant to naturally ocurring acids and alkalies.including contractors profit. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 24 Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing .All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and boulder pitching 25 Making / Fixing ofexpansion jointas per Drawing & direction of engineer-in-charge.For vrb at km 0.740, 3.467, 8.225 26 Painting Chainage & Name of Canal on Km Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For Km stone 27 Painting Chainage / No. on Canal Boundary Stone / 200M Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For cb Stone 28 Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For inlet no 1 and inlet no 2 29 Earth work in Remodelin of escape section for boulder pitchingwith partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. All Work done as per direction of Engineer-in-charge. For boulder pitching 30 Making sub grade in linning work including watering, compaction and preparation of surface. All Work done as per direction of Engineer-in-charge. For boulder pitching 31 Supplying & Layin 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender.The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposureand should be inert to biological degradation and resistant to naturally ocurring acids and alkalies.including contractors profit. All Work done as per direction of Engineer-in-charge. For boulder pitching 32 Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing in 8mm SWG GI Wire Crate Size 1.50x1.50x0.50Mmesh Size 0.15x0.15 M including All Cost of Labour material T&P etc. All Work done as per direction of Engineer-in-charge. For boulder pitching

Key Value

Document Fees
INR 2354 /-
EMD
INR 589260.0 /-
Tender Value
INR 2.94 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail