| 1 | Dismantling & removing damaged AS Flooring including stacking the useful materials for reuse and removing the debries within initial lead & lift etc. complete. |
| 2 | Removing old grading plaster from roof slab, cleaning the surface, lowering and removing the debries within initial lead & lift etc. complete. |
| 3 | Labour for taking out wooden/M. S, door frame and door shutter and refixing the same after necessary repair including screws as may be required and making good damages to walls as per specifications and direction of the Engineer-in-charge. |
| 4 | Earth work in excavation of foundation in hard soil with initial lead and lift …. Etc complete. |
| 5 | Filling foundation and plinth with sand well watered and rammed including all cost, conveyance, royalty and taxex etc complete. |
| 6 | C.C (1:3:6) using 4cm HGCB metal including cost conveyance royalty ……… etc complete. |
| 7 | Fly Ash Brick masonry with C.M. (1:6) in foundation & plinth. |
| 8 | Fly Ash Brick masonry with C.M. (1:6) in super structure. |
| 9 | D.P.C. (1:2:4) using 12mm size HGCB chips including all costs……. Etc complete. |
| 10 | Providing 4 cm thick grading concrete (1:2:4) on Roof slab with 12mm & down grade size hard granite chips for old work including cost, carraige & royalty of all materials etc. complete as directed by Engineer-in-charge. |
| 11 | 25mm thick AS Flooring with C.C (1:2:4) using 12mm size HGCB chips etc. |
| 12 | Cement punning including cost, carraige & royalty of all materials etc complete as directed by Engineer-in-charge. |
| 13 | 16 mm thick cement plastering in c.m. 1:6 over brick masonry including cost, carraige & royalty of all materials etc complete as directed by Engineer-in-charge. |
| 14 | Distempering one coats with distemper of approved shade including cost of materials, conveyance labour …….. Etc complete. |
| 15 | Providing weather coat two coats of approved quality with cost of the paint, conveyances ……. Etc complete. |
| 16 | Supplying and fixing of M.S doors and windows Including cost conveyances, taxes etc complete. |
| 17 | Painting2 coats with synthetic enamel paint on new work/ steel work with cost of paint conveyance ….. Etc complete. |
| 18 | Provision for Water Supply and Sanitation to Staff Quarter |