| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation in all kinds of soil within initial lead and initial lift including rough dressing and breaking rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 2 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC. |
| 3 | Cement Concrete (1:4:8) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 4 | Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 5 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Column base, frustum, plinth band |
| 6 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Bed Block |
| 7 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Column and Beam |
| 8 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Lintel |
| 9 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Roof Slab 1st |
| 10 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- In Ground Floor-Stair case |
| 11 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 1st floor -Bed Block |
| 12 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 1st floor -Column and beam |
| 13 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 1st floor -Lintel |
| 14 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 1st floor -Roof Slab |
| 15 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 1st floor -Stairs |
| 16 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 2nd floor-Bed Block |
| 17 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 2nd floor-Column and beam |
| 18 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 2nd floor-Roof Slab |
| 19 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 2nd floor-Stairs |
| 20 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 3rd floor-Bed Block |
| 21 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 3rd floor-Column and beam |
| 22 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P,Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.-In 3rd floor-Roof Slab |
| 23 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).-In Ground Floor |
| 24 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).-In 1st floor |
| 25 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).-In 2nd floor |
| 26 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).-In 3rd floor |
| 27 | Providing Fly Ash brick masonry workusing 230 mm X 110 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand) (Using Branded Cement), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., Labour Welfare cess @1% completeas per the direction of the EIC.-Plinth & Foundation work |
| 28 | Providing Fly Ash brick masonry workusing 230 mm X 110 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand) (Using Branded Cement), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., Labour Welfare cess @1% completeas per the direction of the EIC.-Superpstrucutre work in ground Floor |
| 29 | Providing Fly Ash brick masonry workusing 230 mm X 110 mm X 80 mm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand) (Using Branded Cement), immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., Labour Welfare cess @1% completeas per the direction of the EIC.-Superpstrucutre work in 1st Floor |
| 30 | Fixing Ceramic tiles size 30 cm x 30 cm / 40 cm x 40 cm in Floors, Treads on steps & landing on 25 mmthick bed ofcement mortar [1:1]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 31 | Fixing Ceramic tiles size 30 cm x 30 cm / 40 cm x 40 cm in Floors, Treads on steps & landing on 25 mmthick bed ofcement mortar [1:1]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 32 | Fixing Ceramic tiles size 30 cm x 30 cm / 40 cm x 40 cm in Floors, Treads on steps & landing on 25 mmthick bed ofcement mortar [1:1]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 2nd floor |
| 33 | Fixing Ceramic tiles size 30 cm x 30 cm / 40 cm x 40 cm in Floors, Treads on steps & landing on 25 mmthick bed ofcement mortar [1:1]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 34 | Fixing Ceramic tiles 20 cm x 30 cm / 20 cm x 20 cm in Dado, Skirting and rises of steps on 12 mmthick cement mortar[1:3]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing completeincluding rubbing and polishing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 35 | Fixing Ceramic tiles 20 cm x 30 cm / 20 cm x 20 cm in Dado, Skirting and rises of steps on 12 mmthick cement mortar[1:3]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing completeincluding rubbing and polishing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 36 | Fixing Ceramic tiles 20 cm x 30 cm / 20 cm x 20 cm in Dado, Skirting and rises of steps on 12 mmthick cement mortar[1:3]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing completeincluding rubbing and polishing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 2nd floor |
| 37 | Fixing Ceramic tiles 20 cm x 30 cm / 20 cm x 20 cm in Dado, Skirting and rises of steps on 12 mmthick cement mortar[1:3]joined with neat cement slurry mixed with pigment to match the shade of the Tiles including rubbing and polishing completeincluding rubbing and polishing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 38 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 39 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 40 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 2nd floor |
| 41 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 42 | 16 mm thick cement plaster in cement mortar (1:6) with watering and curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 43 | 16 mm thick cement plaster in cement mortar (1:6) with watering and curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 44 | 12 mm thick cement plaster in cement mortar (1:6) with watering and curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 45 | 12 mm thick cement plaster in cement mortar (1:6) with watering and curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 46 | Finishing wall surface of walls with Cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 47 | Finishing wall surface of walls with Cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 48 | Finishing wall surface of walls with Cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 2nd floor |
| 49 | Finishing wall surface of walls with Cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 50 | Finishing inside walls with Distemper of approved shade on new work two coats to give an even shade complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 51 | Finishing inside walls with Distemper of approved shade on new work two coats to give an even shade complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 52 | Finishing exterior walls with Weather Seal Coat Paintof approved shade on new work two coats to give an even shadecomplete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 53 | Finishing exterior walls with Weather Seal Coat Paintof approved shade on new work two coats to give an even shadecomplete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 54 | Finishing exterior walls with Weather Seal Coat Paintof approved shade on new work two coats to give an even shadecomplete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 2nd floor |
| 55 | Finishing exterior walls with Weather Seal Coat Paintof approved shade on new work two coats to give an even shadecomplete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 56 | Supplying, fitting & fixing in position & drawingof PVC/FRP panel type single doors shutter with chowkhat framed & fixed [with & Put up]complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 57 | Supply, fitting and fixing of MS FabricatedSheet Door, Sheet Windows with Grills & Ventilators grill made of Sheet, Angle/Sq Bar/Flate section as per approved drawing and design, cutting to required size and welding properly, finished smooth and sand papering, including complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 58 | Supplying, fitting & fixing in position & drawing of Mild Steel in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @0.90mtr. C/C and Mild Steelsquare pipe barracking of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 59 | Laying two layers of Terracotta roof tiles size 265 mm x 165 mm with 2.50 cm cement mortar(1: 6)in between to receive terracing complete including cost, conveyance, royaltyand taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 3rd floor |
| 60 | Priming one coat to surface with Red oxide Primer complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 61 | Priming one coat to surface with Red oxide Primer complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 62 | Painting two coats with approved Plastic Emulsion paint on new wood work complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In Ground Floor |
| 63 | Painting two coats with approved Plastic Emulsion paint on new wood work complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC.-In 1st floor |
| 64 | Cement punning including watering and curing complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 65 | Supply, fixing of RCC pre-castrings of 0.9 m dia, 0.3 m height, 0.050 m wall thickness in soak pit complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 66 | Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650 cfm/ 200 psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc for lowering of 125 mm dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (GI/PVC casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tube well). |
| 67 | Lowering the following size G.I/ PVC pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above. |
| 68 | Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge. |
| 69 | Supply of125 mm (5\") dia PVC Casing pipe (IS:12818:2010) and pipe fittings including testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 70 | Providing & Supplying of½ HP Single Phase Electric Submersible pump set of suitable 200x150 mm Borewelland Reputed & Approved Make & Model by departmentincluding cost and conveyance, taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 71 | Supply of32 mm dia PVC plastic Pipes Schedule -80 as per ASTM -D-1785/2004 and pipe fittings including testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 72 | Supply of 1.5 sqmm submersible Flat Cable with bunched copper conductor insulated and sheathed with PVC for submersible pump motor with voltage up to 1100volt confirming to IS 694/1990 including testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 73 | Supply ofSteel Wire Rope with PVC coated including testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 74 | Supply ofMS 125 mm dia Bore well Capincluding testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 75 | Supply ofMS 32 mm dia \" U \" clampincluding testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 76 | Supply ofControl pannel for operation of ½ HPSingle Phase Electric Submersible pump complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc. complete as per the direction of the EIC. |
| 77 | Supply ofInstallation of submersible pump inside the bore well-fitting of HDPE pipe, tying the pump set with wire rope, connecting the supply line and submersible cable with starter, fixing the pannel board completing all the electrical installation, charging the including testing as per specification complete including cost and conveyance & taxes of all materials and cost of all labour T&P etc complete as per the direction of the EIC. |
| 78 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 79 | Triangular or square section of 0.15m trench cutting for alignment and demarcation purpose of dug belling 10cm to 15cm including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 80 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter spread with boulders up to 1/2 Cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineering- charge within an initial lead of 1 km from the place of excavation complete including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 81 | Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 82 | Provision for Gate & Cross way system |
| 83 | Providing and fixing to wall or ceiling and Floor pvc pipes class conforming to ASTM-D- 1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and Floor all complete as per specification complete.-15 mm dia PVC ASTM pipe (sch-80) |
| 84 | Providing and fixing to wall or ceiling and Floor pvc pipes class conforming to ASTM-D- 1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and Floor all complete as per specification complete.-25 mm dia PVC ASTM pipe (sch-80) |
| 85 | Providing and fixing to wall or ceiling and Floor pvc pipes class conforming to ASTM-D- 1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and Floor all complete as per specification complete.-32 mm dia PVC ASTM pipe (sch-80) |
| 86 | Providing and laying in trenches PVC pipes conforming to ASTM-D-1785/89 (Schedule-80) of the following nominal bore and pipe fittings including testing as per specification complete. (Earth work in trenches to be measured and paid for separately)-32 mm dia PVC ASTM pipe (sch-80) |
| 87 | Supplying and fixing Porcelain 20\" I.W.C.(Orissa Pan) conforming to IS 2556 : Part 3- 2004 duly embedded in cement concrete (1:4:8) using hard granite metal 4cm nominal size all complete as per specification |
| 88 | Providing and fixing 10 litre capacity - White P.V.C. low level flushing cistern with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete |
| 89 | Suppying and fixing Porcelain 20\"x 16\"(500x400) Wash Hand Basin with approved make & model with CI brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc including fixing Chromium Plated waste pipe of 32 mm nominal diameter, Chromium Plated Pillar taps & Chromium Plated Angle Valve of 15 mm dia nominal bore with approved make & model, 15 mm dia PVC inlet connection pipe as per P.H specification including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the workcomplete as per the direction for the EIC. |
| 90 | Fixing 18\"x 16\"x8\" STEEL sink single bowl(Mousumi ) with Cast Iron or M S brackets painted white including cutting holes in walls and making good the damages etc all complete as per specification |
| 91 | Supplying and fitting 15mm dia C.P. long body bib cock with supply of all jointing materials as per P.H specification including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the workcomplete as per the direction for the EIC. |
| 92 | Supplying and fitting 15mm dia C.P. short body bib cock with supply of all jointing materials as per P.H specification including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the workcomplete as per the direction for the EIC. |
| 93 | Supplying and fitting Brass/GM Ball Valve (ISI Marked) of 32 mm nominal bore with supply of all jointing materials as per P.H specification including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the workcomplete as per the direction for the EIC. |
| 94 | Fixing 600mm x 450mm bevelled edge mirror of superior glass mounted on 6mm thick A.C sheet or plywood sheet and fixed to wooden plugs with chromium plated brass screws and washers complete as per specification. |
| 95 | Fixing standard sized Chromium Plated brass towel rail [600x20 mm] complete with Chromium Plated brass brackets fixed to wooden plugs with Chromium Plated brass screws, complete as perspecification |
| 96 | Fixing standard sized glass-shelf with Chromium Plated brass brackets and guard rails complete, fixed to woden plugs with Chromium Plated brass screws as per specification. |
| 97 | Supplyingand fixing 90 mm dia P.V.C. Nahani Trap [PVC Floor traps] as per P.H specification including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the workcomplete as per the direction for the EIC. |
| 98 | Providing and fixing on wall face 110 mm OD P.V.C. SWR S/S Pipe(ISI type-A) soil, waste and rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes |
| 99 | Providing and fixing on wall face PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion-110mm dia PVC SWR coupler |
| 100 | Providing and fixing on wall face PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion-110 x 110 x 110mm dia PVC SWR Tee |
| 101 | Providing and fixing on wall face PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion-110 mm dia P.V.C. SWR plain bend 45\" |
| 102 | Providing and fixing on wall face PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion-110mm diaP.V.C. SWR.pipe clip |
| 103 | Laying in trenches PVC pipes conforming to IS:4985-2000 and specials of the 110 mm OD P.V.C. SWR S/S Pipe(ISI type-A) including jointing with supply of approved solvent cement by non-heat application method including testing as per specification complete. (Earth work in trenches to be measured and paid for separately) |
| 104 | Fixing 500 litre capacity Double Layer Cylinderical Vertical water storage tanksconforming to IS : 12701--1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc, including hoisting upto a height of 10.00 metres above ground level and placing the tank to the required position etc all complete as per specification and direction of the Engineer in charge |
| 105 | Recessed wiring to light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5 Amp, 250 V piano type switch ISI marked and ceiling rose ISI marked mounted on MS box having front bakelite cover of suitable size , MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex / L&T / Anchor / Havels / V Guard ) complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. [Group-C] |
| 106 | Providing, Supplying and fixing of metal box of 150 mm x 75 mm x 60 mm (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 5 pin 5/6 amps socket outlet and 5/6 amps piano type switch, connection, painting etc as required. (For light plugs to be used in non residential buildings) complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 107 | Providing & Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.(Make of wire Finolex/L&T/Anchor/Havels/V Guard) complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 108 | Recessed wiring to submain in 2 x 4 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick alongwith 1 x1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired. (Make of wire Finolex/ L&T/Anchor /Havels /V Guard) complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 109 | Providing & Earthing with G.I earth pipe 3 meter long 40 mm dia ISI marked including accessories and providing masonary enclosure with cover plate having locking arrangment and watering pipe etc with charcoal and salt as required complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 110 | Supplying and fixing batten holder / BK angle holder ISI marked including connection etc. as required complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |
| 111 | Supply, Installation, Testing, and Commissioning of 32 Amp DP Main switches of following capacity (IS 13940 Part 3/1993 ) on existing surface / wall mountnting and complete with HRC Fuse links, interconnections, earthing, etc. complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. Make- SEIMENS /HPL /ANCHOR /L&T /HAVELS /C & S/ RK |
| 112 | Supply, Installation, Testing and Commissioning of resistance type ceiling fan regulator, in existing switch box including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor, earthing the regulator as required complete including cost, conveyance and taxes of all materials and cost of all labour with T&P required for the work, Labour welfare cess@1% etc. complete as per the direction for the EIC. |