|
| 1 | Lifts & Escalators: 1st year Non Comprehensive and 2nd and 3rd Year Comprehensive maintenance service for following lifts including all safetyequipments asper terms and conditions attached. |
| 2 | Lift of Thyson make of 13 passenger capacity,1.5mps, 12 stops. |
| 3 | Lift of Thyson make of 10 passenger capacity,1.5mps, 2 stops. |
| 4 | Providingoperatorsforliftsaspertermsandconditions attached. |
| 5 | E I / Street Light / Out Door Lighting :1st year Non Comprehensive and 2nd and 3rd Year Comprehensive Maintenanceandupkeepofallinternalelectrical installations(emergencyaswellasnormal)on floorsincludingfloorpanel,submains,cables, DBs,pointwiring,fixturesetc.ofthedifferent floors of Integrated Head Quarter Office Complex per inventorylist and as per terms and conditions attached. |
| 6 | Ground floor |
| 7 | First floor |
| 8 | Second floor |
| 9 | Third floor |
| 10 | Fourth Floor |
| 11 | Fifth floor |
| 12 | Sixth floor |
| 13 | Seventh floor |
| 14 | Eighth floor |
| 15 | Nineth floor |
| 16 | Terrace |
| 17 | 1st basement |
| 18 | 2nd basement |
| 19 | HVAC SYSTEM:Comprehensive Maintenanceandupkeepoffollowing air conditioning system as detailed in the inventory list provided and as per terms and condition attached. |
| 20 | Ground floor |
| 21 | First floor |
| 22 | Second floor |
| 23 | Third floor |
| 24 | Fourth Floor |
| 25 | Fifth floor |
| 26 | Sixth floor |
| 27 | Seventh floor |
| 28 | Eighth floor |
| 29 | Nineth floor |
| 30 | 1st basement |
| 31 | 2nd basement |
| 32 | Fire Fighting System |
| 33 | 1st year Non Comprehensive and 2nd and 3rd Year Comprehensivemaintenanceandprovidingservices for operation of sprinkler system and wet riser system along with the allied pumping systemand its accessories etc.round the clock on all days of the year including Sundays & Holidays as per attached inventoryandaspertermsandconditionsattached (job) |
| 34 | DG Sets |
| 35 | 1st year Non Comprehensive and 2nd and 3rd Year Comprehensive RunningOperationsmaintenance ofstandby DGsetof1010 KVA 2 Nos and 500KVA 1 no.capacity onallthe days round the clock on all days of the year including Sundays&Holidayscompletewithallmaterialsi/c mobil oil, grease etc and all other such things required for its satisfactory functioning including the allied pumping system and cooling towers etc. but excluding diesel oil as per inventory attached as per terms and conditions attached. |
| 36 | Consumption ofHigh SpeedDiesel oilfor DGset asper terms and conditions. |
| 37 | Substation Power Distribution system |
| 38 | 1st year Non Comprehensive and 2nd and 3rd Year Comprehensive Maintenance and upkeep of all HT,LT electricalinstallationsincludingpanels,transformers, bus ducts, power cables,earthing pits,lightening protectionsystems,UPSetc.uptofloorpanelas detailed in inventory list provided and as per terms and conditions attached.(Job) |
| 39 | LOW VOLTAGE SYSTEM:1st year Non Comprehensive and 2nd and 3rd Year Comprehensive maintenance and upkeep of following low voltage system as detailed in inventory list provided and as per terms and conditions attached. |
| 40 | Fire detection system |
| 41 | Voice evacution system |
| 42 | Lighting management system |
| 43 | EPABX- system |
| 44 | Building Management System |
| 45 | 1st year Non Comprehensive and 2nd and 3rd Year ComprehensivemaintenanceofCCTVSurveillance system installed in the building,Basement-1,Baement-2,&Outer area as per attached inventory and as per terms and conditions attached. |
| 46 | 1st year Non Comprehensive and 2nd and 3rd Year Comprehensive maintenance ofConferencing, Video Projection,CCTV&alliedsysteminstalledinthe Council& Conference hallsas per attached inventory and as per terms and conditions attached. |
| 47 | 1st year Non Comprehensive and 2nd and 3rd Year ComprehensiveAMC for Repair & maintenance contract of the Audio system(As per list ofinventory ) installed in Building,periodical checking & preventivemaintenance,attendingcomplaintswithin 24 hours or replacement of defective parts or to keep the system in working order through out the duration of contract. |
| 48 | 1st year Non Comprehensive and 2nd and 3rd Year Comprehensive MaintenanceofstageLighting EquipmentincludingCurtainTracks,WinchMotors, but excluding Lamps and Cloth as required and as per list of inventory. |
| 49 | Engagement of stage lighting system operator for daytodayprogramme/functioninAuditoriumi/c checking/testingthe equipment for operation of stage light system for8 Hrs. a day as &when required as per the direction of Engineer-in-charge. |
| 50 | Extra over time allowance (OTA) beyond 8 Hours duty for attending the programme duty in the Auditorium. |
| 51 | Extra for over time allowance (OTA) beyond 8 Hoursnormal duty etc. as required. |
| 52 | Allied New Electrical Works |
| 53 | Allied electrical works which may be required fromtime to time based on CPWD DSR 2022 + cost Index (LS for Rs 15 lacs) |
| 54 | Plumbing, water supply &Drainage Works: 1st year Non Comprehensive and 2nd and 3rd Year Comprehensivemaintenanceandupkeepofthe following as per inventory list attached and terms and conditions to keep the system operational at all the times includind sundays and other gazzetedholidays. |
| 55 | Ground floor |
| 56 | First floor |
| 57 | Second floor |
| 58 | Third floor |
| 59 | Fourth Floor |
| 60 | Fifth floor |
| 61 | Sixth floor |
| 62 | Seventh floor |
| 63 | Eighth floor |
| 64 | Nineth floor |
| 65 | Terrace |
| 66 | Plumbing &Drainage Works of Basements: 1st year Non Comprehensive and 2nd and 3rd Year Comprehensivemaintenanceandupkeepofthe following as per inventory list attached and terms and conditions to keep the system operational at all the times includind sundays and other gazzetedholidays. |
| 67 | Second Basement |
| 68 | First Basement |
| 69 | Civil Work and Mechanized Housekeeping services:1st year Non Comprehensive and 2nd and 3rd Year Comprehensivemaintenanceandupkeepofthe followingas per inventory list attached and terms and conditions to keep the building operational at all the times on all working days |
| 70 | Ground floor |
| 71 | First floor |
| 72 | Second floor |
| 73 | Third floor |
| 74 | Fourth Floor |
| 75 | Fifth floor |
| 76 | Sixth floor |
| 77 | Seventh floor |
| 78 | Eighth floor |
| 79 | Nineth floor |
| 80 | Terrace |
| 81 | Civil Maintenance of Basementsand Mechanized Housekeeping services: 1st year Non Comprehensive and 2nd and 3rd Year Comprehensivemaintenanceandupkeepofthe followingas per inventory list attached and terms and conditions to keep the building operational at all the times on all working days |
| 82 | Second Basement |
| 83 | First Basement |
| 84 | Façade cleaning and maintenance |
| 85 | Civilmaintenanceofexternalworki/croads, pathways,planters, boundary wall, gates etc. |
| 86 | Horticulture Work |
| 87 | Complete maintenanceofthe entiregardenfeatures ofthegardenareai/clawn,trees,shrubs,hedge, pottedplants,flowerbeds,creepersetc.andother garden features including watering hoeing, making of plantsbasin,manuring, trimming and cleaningof hedges/plantsbeds,sprayingofinsecticides, fungicides, weeding, mowing and top dressing of lawn with good earth and manureand hedgeclipping and removalofthegardenwasteasperdirectionand satisfaction of the officer-in- charge (including the cost ofmanurerandgoodearth,whereverrequired)to maintaintheplants,hedgeandlawnsingoodand healthy conditions at alltime duringthe maintenance period. |
| 88 | Removal of garden rubbish obtained from day to day horticulture maintenanceworki/c machinecut grass, plant waste etc. completeand as per the satisfaction of the officer-in- charge. |
| 89 | Allied Horticulture works which may be required from time to time based on CPWD DSR 2021 + cost Index (LS for 10 lacs) |
| 90 | Allied New Civil Works |
| 91 | Allied civill works which may be required from time to time based on CPWD DSR 2023 + cost index (LS for 20 lacs) |
| 92 | works |
| 93 | Pest control Services as per scope of work |
| 94 | Operation and Maintenance of Solar system installed at site |
| 95 | Charges towards providing complaint management app |