|
| 1 | EarthworkinOrdinarysoilorgravellysoilwithin50m.Initial lead and 1.5m initial lift including rough dressingand breakingclods to maximum5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Filling in foundation and plinth with sand watered and rammed including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 3 | Cement concrete (1:3:6)with 4cm size hard granite crosser broken metal in foundation including cost, conveyance and royality and as per the direction of the Engineer-in-charge. . |
| 4 | Brick work with Flyash bricks 25cm x 12cm x 8cm sizehavingcrushingstrengthnotlessthan75Kg/cm2 with dimensionaltolerance±8 percent in cement mortar(1:6) in foundationand plinthincluding cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 5 | Brick work with Flyash bricks 25cm x 12cm x 8cm sizehavingcrushingstrengthnotlessthan75Kg/cm2 with dimensionaltolerance±8 percent in cement mortar(1:6) in Superstructure including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 6 | Cement Concrete (1:2:4) using 12mm size B.H.G.C.B. chips including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 7 | R.C.C-M-20 using 20mm and down graded chips laying& lowering concrete watering curing etc complete including cost ofSteel Centering and Shuttering including cost, conveyance and royality and as per the direction of the Engineer-in-charge. (Column base & footing) |
| 8 | Plinth band |
| 9 | Column in Superstructure |
| 10 | Roof Beam |
| 11 | Lintel |
| 12 | R.C.C Chajja |
| 13 | R,C.C Roof Slab |
| 14 | Supplying ,fitting and placing uncoated HYSD bar reinforcementincluding cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 15 | Providing 20mm thick Grading Plaster in Cement mortar (1:4) with 2% water profing compound including cost of materials, labour, T&P all comp. |
| 16 | Supplying, fitting and fixing approvedofM.S door,grill including cost of materials etc. and as per the direction of the Engineer-in-charge. |
| 17 | Supplying of M.S.Window with grills, Grills, collapsible gates made out of M.S. Angle frame, M.S. Flat, Sheetetc of approved section & design, electrically welded properly with all necessary locking arrengement including cost of all materials, labour T&P, carriage of materials to site etc. complete. |
| 18 | 12mm. thick cement plaster (1:6) for brick work including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 19 | 16 mm. thick cement plaster (1:6) over brick work including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 20 | 6mm. thick cement plaster (1:4) to R.C.C surface finished smooth including closed deep chipping and slury treatment including cost, conveyance and royality and as per the direction of the Engineer-in-charge. |
| 21 | 2.5cm thick A.S flooringwith C.C (1:2:4) using 12 mm chipslowering and laying concrete with punning etc complete. |
| 22 | Providing and Painting wall Surface one coat with wall Primer to give an even shed before applying distemper including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification. |
| 23 | Providing and Painting Finished wall surface withWeather Coat Paint two coats over a coat of primer ofcomp. of approved shed to Exterior walls including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge. |
| 24 | Distempering two coatsto inside walls over a coat of primer with approved make distemper of approved shed on new work to give an even shed including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification. |
| 25 | Painting two coats with approved paint on new Iron work over coat of primer etc. Enamel paint including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge. |