Construction Of Entrance Arch In Panchayat Union Office Campus In Tenkasi Panchayat Union Lf-1 2024-25 , Earth Work Excavationanddepositingon Bankwithaninitiallead10 Manlifitof2 M In All Soils Such As Red Earth ,Hard Stiff Clay Soil, Stiff Black Cotton Soil,Hard Redearth,Shales, Murrams, Gravel, Stoneyearthandearthmixedwithsmallsize Bouldersete Complete.,For Foundation Ss 20B , First Depth Upto 2 M , 2Nd Depth Of 1M , Sand Filling For Foundation With Clear M Sand Including Cost Of Sand Watering, Ramming And Consolidationetc Complete As Directed By Twad Board Officers. , Sand Filling For Foundation With Excavated Earthincluding Cost Of Sand Watering, Ramming And Consolidationetc Complete As Directed By Twad Board Officers. , Cementconcrete1:4:8 (One Cement Four Sand And Eight Aggregates) Using 40Mm Hbgs For Levelling Course For Foundation Including The Cost Of Mixing Concrete, Ramming, Curing Etc., Complete As Directed By Twad Board Officers. , 1.5M To 4.5M Below Gl , Supplying And Eractingsteelcenteringforsidesandsoffitsincludingnecessarysupportsandshutteringtotherequiredheightforrccitemsusingmssheetsorsuitablesizeofbg 10Stiffenedwithweldedmsanglesofsize 25Mmx25mmx3mmofboarfing,Laidoversilveroakjointsofsize 10Cmx6.5 Cmspacedat90 Cm Centertocenterandsupportedbycasuarinaprops10 Cm To13 Cmdiaspacedat75 Cmcentertocentercomplyingwithstandardspecificationetccompleteandasdirectedbydepartmentalofficers , Planesurface , Below G.L. , Above Gl (+5.300- +6.300M) , Above Gl(6.300 - +7.300M) , Square Column , Below G.L. , Above Gl (0.00 -+3.300M) , Above Gl (+3.300 - +4.300M) , Above Gl (+4.30 -+5.300M) , Above Gl (+5.30 -6.300M) , Exterior Emulsion Painting Two Coats With Best Approved Quality And Colourpaint Over One Coat Of Base Coat Including Cost And Convyance Of All Materials To Work Site And Labour Charges Etc., Complete. , Supplying, Fabricating And Placing In Position Of Hsd Steel Rods For Reinforcement Including The Cost Of Steel And Binding Wire Etc., Complete And As Directed By Twad Board Officers. , Reinforced Cement Concrete 1:1.5:3 Mix Using 20Mmiss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying, And Curing Etc Complete For 10 Cum. , 1.50M To 4.50M Below Gl , 0M To 1.50M Below Gl , Above Gl (0.00 -+4.500M) , Above Gl (+4.500 M - +7.320M) , Brick Work In Cm 1:5 Mix Using Third Class Country Bricks Of Size 8 3/4 X 4 1/4 X 2 3/4 Including All Cost And Conveyance Of Materials And Labour Charges Etc., Complete , Plastering With Cm 1:5 Mix Using To 12Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete. , Plastering With Cm 1:3 Mix Using To 10Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete. , Dadooing Of Walls With Colour Glazed Tiles Of Size 15 Cm X15cmx6mm Laid In Cm 1:2, 10Mm Thick & Pointing With Colour Cement Using 0.4Kg/Cm2-10Sqm. , Finishing The Top Of Slopped Roof, Sun-Shade With Decorative Tiles (Ornamental Tiles) Of Approved Quality Laid In Cement Mortar 1:3 20Mm Thick Mixed With Wpc At 2% By Weight Of Cement Used And Top Pointed With The Same Red Oxide Mixed Mortar Etc Complete, Complying With Standard Specifications , Gst Amount For Providing Service To Government Contract Works For The Above Renewalworks. { Gst Amount Is The Total Gst Amount For Overall Quoted Amountabove This Row In Column Bb For All Works In This Package} (Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders (Itb) Of Sbd)