|
| 1 | Safe Carriage of following T/F, VCB, PILFER, CT/PT Meteringfrom Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
| 2 | T/F 400 KVA 11/0.4 KV |
| 3 | 11 KV VCB FOR O/G CTR 200/100/5A |
| 4 | 11 KV Pilfer proof Metering Cubical 25/5A |
| 5 | 11 KV CT/PT Metering Pole Mounted Unit 25/5A |
| 6 | Other loose line materials with including conductor, PVC Cable, Insulator, Single Pole accessories etc.from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 7 | ACSR Dog Conductor |
| 8 | 11 KV XLPE Cable size 3x120 sq mm |
| 9 | ST Pole 11 mtr long |
| 10 | LT XLPE Cable size 3.5x400 sq mm |
| 11 | 11 KV XLPE jointing Kit 3x120 sqmm I/D AND O/D |
| 12 | Making T-off and V Type Cross Arm arrangement including fabrication & fitting of accessories. |
| 13 | Grouting of ST Pole as per RESPO Norms with grouting materials. |
| 14 | Earthing of pole as per RESPO Norms. |
| 15 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 16 | Erection of D/P following type HT Lines including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 17 | Laying of 11 KV 3-phase line stringing and sagging of ACSR Dog conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required. |
| 18 | Construction of T/F Plinth of size 2x2x1.5 m on a padding 0.25 M deeo in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick, brick work in ration 1:4 cement & cores sand in the hollow portion the sand should be filled from the ground level up to 15 centimeter below from the top of wall, cement, sand & brick ballasts should be filled up to 15 centimeter. Two nos. of channel 100x50 in length 1500 mm will be grouded, 0.35 CM. RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4. The T/Fs plinth should be plastered on all sides 12 mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor) |
| 19 | Placement of 11/0.4 KV T/F from dump site to newly constructed T/Fs Plinth & installation and commissioning of 400 KVA T/Fs of T/F Plinth and including jumpering with the system. (All the required materials as Al. Lugs Crimping Type for 400 KVA T/F, Copper L-piece 62x225x12 mm etc for above job shall be provided by contractor except T/Fs and LT PVC Cable) |
| 20 | Construction of retaining wall, fabrication & erection of Wiremesh fencing around Transformer with retaining wall & 01 nos. gate with locking arrangement made of MS Angle Iron of size 50x50x6 mm jointed with nuts and bolts. Wiremesh of size 10 swg rectangle type, its painting as per norms of RESPO. (All the materials will be arrangement by the contractor) |
| 21 | Earthing of Neutral of Transformer, Transformer body and double pole by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 20 Mtr. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X6 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral, Body & D.P. connection being done by G.I. Strip.(All the materials will be arrangement by the contractor) |
| 22 | Supply and fixing of Copper L-piece 400 sq.mm. 4 Nos. and Allu. Lugs 400 sq. mm 12 no. All Material provided by contractor. |
| 23 | Installation of 11 KV VCB O/G, CTR 200/100/5Aat Site. |
| 24 | Installation of Metering Cubical With CT/PT unit and Proper connection as per requiredat Site. |
| 25 | Earthing of Neutral of 11 KV VCB O/G, CTR 200/100/5A, and 11 KV Pilfer proof Metering Cubical 25/5A Transformer body and double pole by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 20 Mtr. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X6 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which All neutral, Body & D.P. connection being done by G.I. Strip.(All the materials will be arrangement by the contractor) |
| 26 | Fixing of cable Jointing kit of 3x120 sq mm |
| 27 | Laying of 11 KV XLPE Cable3x120 sq mm |