Construction Of Supply Well At Chougulewadi/Kolgewadi, Tal. Patan, Dist. Satara - Subwork No.1 -Supply Well (Strengthening of Sourse) 2 1.Disilting the supply well in wet or dry condition includinglift up to 1.50m and lead 150m stacking , spreading as direcied etc. 3 Lift up to 9.00mtr 4 2.Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5M and lead of 150 M including barricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer incharge, etc. complete excluding refilling.a)For Head Works on river or dam submergence 5 Lift 0.00 - 1.50 m 6 Lift 1.50 - 3.00 m 7 Lift 4.50 - 6.00 m 8 3.Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc. by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including barricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.a)For Head Works on river for initial lift 0 to 1.5M. 9 a} Lift 6.00 to 7.50 m. 10 b} Lift 7.50 to 9.00 m. 11 c} Lift 9.00 to 10.50 m. 12 d} Lift 10.50 to 12.00 m. 13 4.Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)(P.C.C.) below flooring. 14 PCC 15 5.Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) 16 6.Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement)in RCC M-300. 17 a) For wall and landingM 300 18 RCC 19 7.Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F-17/306) 20 8.Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineer incharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277) 21 9.Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) 22 10.Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. 23 11.Providing and fixing M.S. chaquerred plate flooring of following thickness supported on M.S. angles(25x25x5 mmsize) including welding, cutting and fabricating the plate to the required square or rounding shape, making holes in the plate including providing and applying 3 coates of anticorrosive paint etc. complete. As directed by Engineer-in-charge.A) 6 mm thick 24 Subwork No - 2Miscellaneous 25 ITEM NO.1- Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat ofZinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mm x35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge