|
| 1 | Providing and erecting Shamiyana with 4” to 6” Ballies with 10” centre of required height with proper shape etc. Pendal as directed by Engineer-in-charge with G.C.I. Sheet on top or with Canvas Tarpoline or HDPE Tarpoline of approved thickness to Ballies/Bamboos Frame with approved colour with ceiling etc. complete as Directed by Engineer- in- Charge for the period ofc) ThreeDays. |
| 2 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 3 | Providing and Fixing platform on the ground in the form of 15 to 20 cm, c-c or wooden blocks and ply made of 18 mm thick wooden planks/ sheet plates etc. complete as directed by Engineer-in-Charge for the period of c) Three Days |
| 4 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 5 | Providing and erecting sides of Shamiyana & Pendal with G.C.I Sheets with 4” to 5” dia wooden Ballies / Bamboos as directed by Engineer-in-charge for period of.c) ThreeDays. |
| 6 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 7 | Providing and erecting stage upto height 0.60meter to 1.20 meter with Top of necessary Wooden Planks supported by Frame on Wooden Ballies Vertical / Horizontal complete as directed by Engineer-in-charge for period of. c) Three days |
| 8 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 9 | Providing and erecting cloth railingsiding for the period of One days |
| 10 | c) ThreeDays. |
| 11 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 12 | Hire charges of plastic moulded of chairs for the period ofone days |
| 13 | c) ThreeDays. |
| 14 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Charges including to and Fro.Transportation and arranging the materials as per direction given on site by the authority). |
| 15 | Hire charges of steel folding table for the period of.three days |
| 16 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Charges including to and Fro. Transportation and arranging the materials as per direction given on site by the authority). |
| 17 | Hire charges of VVIP chairs for the period of.three days |
| 18 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Charges including to and Fro. Transportation and arranging the materials as per direction given on site by the authority). |
| 19 | Hire charges of V.I.P chair without arms / with arms Foam Seat & back for the period of.three days |
| 20 | d) Extra for more than 3 days extra for per day (Charges including to and Fro. Transportation and arranging the materials as per direction given on site by the authority). |
| 21 | ProvidingCarpet of approved colour (Green or Red) by Engineer Incharge for the period of one days |
| 22 | b) Two Days |
| 23 | c) ThreeDays. |
| 24 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 25 | ProvidingMatting of approved colour (Green or Red) by Engineer Incharge for the period of One days |
| 26 | b) Two Days |
| 27 | c) ThreeDays. |
| 28 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 29 | Providing and erecting Gate of approved only colour by Engineer-in-charge for the period of three days |
| 30 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 31 | Providing Velvet Cloth of approvedcolour by Engineer-in-charge for the period of Three days |
| 32 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 33 | Providing and erecting decorative gates of 15\" X 15\" and colour piller of plaster of paris approved colour by Engineer-in-charge for the period of three days |
| 34 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 35 | Providing and erecting decorative state piller platform carpet, chair 2 Nos. back side cloth of approved colour by Engineer-in-charge for the period of (size 15\" X 15\")three days |
| 36 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 37 | Providing and erecting Dom iron structure height 27\" X 32\" tarpouline white ceiling, siding tarpouline and sheet siding complete by Engineer-in-charge for the period of Three days |
| 38 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 39 | Providing VIP sofa set three seater of approved colour by Engineer-in-charge for the period ofThree days |
| 40 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 41 | Providing Podium by Engineer-in-charge for the period ofone days |
| 42 | Providing and erecting Super quality ceiling cloth forpendal approved colour etc. complete by Engineer-in-charge for the period ofthree days |
| 43 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |
| 44 | Providing and erecting Super Quality siding cloth of approved colour etc. complete by Engineer-in-charge for the period ofthree days |
| 45 | d) Extra for more than 3 days i.e. beyond 3 days extra for per day (Day will be counted after satisfactory erection only). |