Electric Work Works Related To System Strengthening, Construction Of Sub-Centres, Capacity Increase, Construction Of Ht Line, Dilapidated Wires, Replacement Of Poles Etc.-2 Safe carriage of stor mattrial from store center to site store with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 50 Kms. 3 PCC Poles 8.5 mtr. long 4 PCC Poles 9 mtr. long 5 ST Poles 11 mtr. long 6 Loading, Safe carriage & unloading of heavy stock material V Type, Disc Insulator, Pin Insulator, channel, Angle and other site requerment any mattrial ETC from store center to site store with proper stacking of material, distancewithin-70Kms. 7 Loading, Safe carriage & unloading of LT/HT cable, T/F, VCB & control panal etc from store center to site store with proper stacking of material, distancewithin-70Kms. 8 LT T/F Lead any size 9 3x300 Sq.mm. XLPE Cable 11 KV 10 3x185 Sq.mm. XLPE Cable 11 KV 11 3x300 Sq.mm. XLPE Cable 33 KV 12 3x120+1x95+1x16 Sq mm AB Cable 13 3x95+1x50+1x16 Sq mm AB Cable 14 3x50+1x35+1x16 Sq mm AB Cable 15 ACSR Dog Conductor 16 ACSR Rabit/Wisel Conductor 17 11 Kv VCB 18 T/F 10 KVA 11/0.25 KV 19 T/F 25/63/100 KVA 11/0.4 KV 20 T/F 250 KVA 11/0.4 KV 21 33 KV Fuse Set complet 22 11 KV Fuse Set complet 23 Earthing rod all type 24 DISTRIBUTION BOX 3 PHASE Complet 25 Erection of Single pole ST Pole 11 mtr long of 33 KVfittingsas per RESPO Drawing Top Channal, Dropper Channal, X Bracing Set, Disc Insulator, Pin Insulator, Guarding Angle F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 26 Erection ofDobule pole ST Pole 11 mtr long of 33 KVfittingsas per RESPO Drawing Top Channal, Dropper Channal, X Bracing Set, Disc Insulator, Pin Insulator, Guarding Angle F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 27 Excavation of For Each and grouting of Single Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc.The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Bricks/Stone Ballast, etc. as per actual site requirement 28 Excavation of For Each and grouting of Dobule Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc.The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Bricks/Stone Ballast, etc. as per actual site requirement 29 Provading & Fixing of Planth of pole/Kiking of pole up nuturel Ground level. 30 Fixing of Garding of 11 Kv line 6/8 SWG wire. 31 Fixing of 11 Kv stay set 32 Grouting of 11 Kv stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone etc. as per actual site requirement , labour, T&P etc required for proper completion of work. 33 Laying sagging stringing and binding and jumpering in air area etc of following ACSR Conductor/ wisel/Rabit/ABC all size on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. 34 LT T/F Lead any size 35 3x300 Sq.mm. XLPE Cable 11 KV 36 3x185 Sq.mm. XLPE Cable 11 KV 37 3x120/185 Sq.mm. XLPE Cable 33 KV 38 3x120+1x95+1x16 Sq mm AB Cable 39 3x95+1x50+1x16 Sq mm AB Cable 40 3x50+1x35+1x16 Sq mm AB Cable 41 ACSR Dog Conductor 42 ACSR Rabit/Weasel Conductor 43 Fixing of 11 Kv Cable jointing kit I/D 44 Fixing of 33 Kv Cable jointing kit I/D 45 Fixing of 11 Kv VCB 46 Fixing of T/F 10 KVA 11/0.25 KV 47 Fixing of T/F 25/63/100 KVA 11/0.4 KV 48 Fixing of T/F 250 KVA 11/0.4 KV 49 Making Jumpers on Section Points, byfixing of proper sizes, suitable for ACSR Conductor.Sectional Double/Four Pole. 50 Providing OF Danger Plate. 51 Fixing of Danger Plate. 52 Testing and commissioning of 11 kv VCB. 53 Providing & Fixing of Chemicle earthing Electrod rod. 54 Providing of G.I. Pipe for cable D/P 55 Fixing of G.I. Pipe for cable D/P 56 Drilling of Two Parallel bores by trench less Method by horizantal Boring by HDD Machine at RESPO ground Level For 11/33 kv cable 57 Providing of HDPE Pipe For 11/33 kv cable off size 58 Fixing of HDPE Pipe For 11/33 kv cable off size 59 Providing Interconnecting 6 Mtr. Long Pieces of HDPE Pipe shocket. 60 Fixing and Interconnecting 6 Mtr. Long Pieces of HDPE Pipe shocket. 61 Digging of Pits Of Size 4 Mtr X 4 Mtr X 1.5 Mtr. For Cable Loop 62 Restoration of Pit After Laying Of Cable loop 63 Restoration of kacha Road After Laying Of Cable. 64 Digging of cable trench for all type cable laying 65 11/33 KV XLPE Cable laying OVERHEAD 66 G.I.Wire 6/8 SWG 67 Fixing of T Off channel. 68 Fixing of Stone Pad 69 Providing & Fixing barbard wire 70 Fixing of Top/Drop channel Set 71 Fixing of MS Angle 65x65x6 Set 72 Fixing of 11 KV V CROSS-ARM 73 Fixing of 33 KV V CROSS-ARM 74 Provading of Nut-Bolts off size 75 Fixing of Garding Angle 76 Fixing of Nut-Bolts off size 77 Provading of Nut-Bolts off size for distubation box and No. plate/danger plate 78 Fixing of Nut-Bolts off size for distubation box and No. plate/danger plate 79 THE WORK OF MAKING 0F T/F PLANTH FOR 250/400 KVA T/F 80 THE WORK OF MAKING 0F T/F FANCING MS Angle & Jalie FOR 250/400 KVA T/F 81 Fixing of DISTRIBUTION BOX 3 PHASE 82 Provading of Peircing Clamp all size 83 Fixing of Peircing Clamp all size 84 Provading of Lock for distribution box 85 Fixing of Lock for distribution box 86 Provading of GI-Hook for guarding. 87 Fixing of GI-Hook 88 Fixing of Cross Bracing 89 Provading of J-Hook 90 Fixing of J-Hook 91 Provading of Dead End Clamp/Suspension Clamp 92 Provading & Fixing all tipe Cross arm Clamps. 93 Provading & Fixing F Clamps. 94 Provading & Fixing PRC 95 Provading & Fixing I Bolt. 96 Provading & Fixing TF Clamps. 97 Provading & Fixing LT Clamps. 98 Fixing of Dead End Clamp/Suspension Clamp 99 Fixing of 33 KV Fuse Set 100 Fixing of 11 KV Fuse Set 101 Provading of Stay insulator 102 Fixing of Stay insulator 103 Disconnecting the connection before starting the work and reconnecting it to the distribution box after completion of the work per unit. 104 Painting of Pole 105 Fixing of 11/33 Kv Stay Set complet 106 Fixing of 11/33 Kv Stay Set wire 107 Fixing of 11 KV pin Insulator 108 Fixing of 11 KV Disc Insulator 109 Fixing of 33 KV pin Insulator 110 Fixing DP CLAMP 111 Fixing of 33 KV Disc Insulator