Tender For Construction Of Akrur Ghat In Vrindavan City On The Right Bank Of River Yamuna In District Mathura, 1 Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete. 2 Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete. 3 Supplying and Filling empty cement bags with local earth/RBM/silt, hand sewing with suja & sutli and placing in position within 60 M placing as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete. 4 Driving Sheet piles as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete. 5 Applying ready mix primer on steel sheet pile including all material, labour and T&P etc. complete. 6 Applying one coat Anticorosive paint on steel steet pile including all material, labour and T&P etc. complete. 7 Providing and laying bitumen cake including all material, labour and T&P etc. complete. 8 Providing and laying 45 MM Dia G.I. bar for anchoring including all accessories, all material, labour and T&P etc. complete. 9 Providing and fixing ISC 225X80X6.50 MM wall for anchoring incliding all accessories, all material, labour and T&P etc. complete. 10 Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete. 11 Earth work in cutting from river bed disposal of within 1.00 Km. as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete. 12 Earth work in foundation in ordinary soil including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches. 13 Shuttering (steel shuttering) for C.C. Blocks and concrete including cost of shuttering all labour, material and T&P etc. Complete. 14 Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. 15 Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. 16 Centering and shuttering (steel shuttering) for R.C.C. work including cost of all labour, material and T&P etc. Complete. 17 Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. 18 Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. 19 Supply and Laying 60 mm thick Red sand stone with 1:3 CM including cost of all material, labour and T&P etc. complete. 20 Supply and Laying dry cut/split stone boulder (size 25-40 Kg.) in launching apron as directed by Engineer-in-charge including cost of all material, labour and T&P etc. complete. 21 Providing and laying Coarse sand in filter with cost of all material. 22 Providing and laying Pea gravel 6.70 mm and below in filter with cost of all material. 23 Grouting stone pitching with grout mix in 1:2 cement mortar including cost of all material l,labour T&P etc complete 24 Earth work in removal of coffer dam & cross bar including all lead & lift with its proper disposal as per direction of Engineer-in-charge including cost of all material, labour and T&P etc. complete. 25 Providing and fixing stainless steel (Grade304) railing made of hollow tubes, welding, grinding, buffling, polishing and making curvature and also including all material, labour and T&P etc. complete. (Wt.=60 Kg./sqm)