| 1 | Renovation ofSchool Building at Sikkapatti PUMS RCC Roof West face in Melathur Panchayat. |
| 2 | Dismantling the damaged flooring including all labour charges etc.,complete. |
| 3 | Dismantling the Chipping the Concrete and Rougheningincluding all labour charges etc.,complete. |
| 4 | Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thickincluding cost and conveyance and all labour charges etc |
| 5 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 6 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 7 | Pointing with cement mortar 1:3 mixto full Depthincluding cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 8 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 9 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 10 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 11 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD WALL) |
| 12 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 13 | Black Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 14 | Wiringwith 2x4 Sq.mm (56/0.3) PVC insulated SC unsheathed Cu. conductor of 1100v grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. swithc box and 5A F.T. switch with painting of suitable colour for openpower plugpoint (for regultor ) SD 36 |
| 15 | Supply and fixing of Fixing of Fancy Glass Shade of 40W Bulb BH Point (SD 88) |
| 16 | Supply and Fixing of PVC Rain water pipe including cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 18 | Renovation og School toilet Girls Unit at SikkapattiPUMS in Melathur panchayat. |
| 19 | Dismantling the Chipping the Concrete and Rougheningincluding all labour charges etc.,complete. |
| 20 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 21 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 22 | Supplying and Fixing of special type hydraulic pressed anti skidTilesincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 23 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) |
| 24 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 25 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 26 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD WALL) |
| 27 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 28 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 29 | Supply and Fixing of RCC rings 900mm dia etc completed., |
| 30 | Supply and Fixing of RCC cover Slab 900mm dia etc completed., |
| 31 | Supply and Fixing of 100mm doa PVC pipe |
| 32 | Renovation ofSchool Building at Sikkapatti PUMS RCC Roof West face in Melathur Panchayat. |
| 33 | Dismantling the damaged flooring including all labour charges etc.,complete. |
| 34 | Dismantling the Chipping the Concrete and Rougheningincluding all labour charges etc.,complete. |
| 35 | Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thickincluding cost and conveyance and all labour charges etc |
| 36 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 37 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 38 | Pointing with cement mortar 1:3 mixto full Depthincluding cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 39 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 40 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 41 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 42 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD WALL) |
| 43 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 44 | Black Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 45 | Wiringwith 2x4 Sq.mm (56/0.3) PVC insulated SC unsheathed Cu. conductor of 1100v grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. swithc box and 5A F.T. switch with painting of suitable colour for openpower plugpoint (for regultor ) SD 36 |
| 46 | Supply and fixing of Fixing of Fancy Glass Shade of 40W Bulb BH Point (SD 88) |
| 47 | Supply and Fixing of 1200mm ceiling Fanincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 48 | Supply and Fixing of PVC Rain water pipe including cost and conveyance of all materials to site and all labour charges etc complete |
| 49 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 50 | Renovation of School toilet Boys Unit at SikkapattiPUMS in Melathur panchayat. |
| 51 | Dismantling the Chipping the Concrete and Rougheningincluding all labour charges etc.,complete. |
| 52 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 53 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 54 | Supplying and Fixing of special type hydraulic pressed anti skidTilesincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 55 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) |
| 56 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 57 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 58 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD WALL) |
| 59 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 60 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 61 | Supply and Fixing of RCC rings 900mm dia etc completed., |
| 62 | Supply and Fixing of RCC cover Slab 900mm dia etc completed., |
| 63 | Supply and Fixing of 100mm doa PVC pipe |
| 64 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |