Tender For Construction Of 1,00,000 Litre Capacity Sump Jeyajothi Nagar At Peedampalli Panchayat At Sulur; 2 Earthwork excavation in sand, siit other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARDOfficers.For Foundation 3 Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc., with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARDOfficers. For Foundation First depth of 0 to 2 m 4 a.For SDR (2 nd Depth of 2m to 3m 5 b. For DMR not Requiring Blasting 6 Levelling coarse in cement concrete 1:4:8 (one cement, four sand and eightaggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by TWAD BOARD Officers. 7 PCC Laying (beyond 1.5 m from GL) 8 Reinforced Cement ConcreteM30using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directedby TWAD Board Officers. 9 cum Beyond 1.50 m & upto 4.50 m below GL 10 Reinforced Cement Concrete M30using Machine crushedHBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by TWAD Board Officers. 11 a.Upto 1.50 m Below GL 12 b.Upto 4.50 m above GL from GL 13 Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm 13cm spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers. 14 a.For 0.00 to 3.30 M (Plane Surface) 15 b.For 0.00 to 3.30 M (Curved Surface) For 0.00 to 3.30 M (FOR ROUND COLUMN) 16 c.FOR CIRCULAR COLUMN 17 d.For 3.30 M-4.3 M (Plane Surface) 18 Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by TWAD Board Officers.For RCC Works 19 Upto 16 mm dia 20 Supply, Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials, fixing of MS clamps, Bolt and nuts etc., complete and as directed by TWAD Board Officers. Size 0.60 m * 0.60 m 21 Painting two coats with best Emulsion paint including all cost of Materials & labour charges etc. complete.and as directed by TWAD Board Officers. 22 Supplying and fixing in position of RCC (1:1.5:3) in side access lader of following size using 20mm size HBS jelly including cost of all materials, centring, shuttering, strutting, fabrication and placing in position of reinforcement, finishing, curing etc., complete and as directed by TWAD BoardOfficers 23 Provision for supply & fixing of MS ladder including all cost of Materials & labour charges etc. complete.and as directed MS Ladder 24 Refilling the foundation with excavatedSoil (other than sand) in layers of notmore than 15cm thick, watering, wel Iramming, consolidating, complying with standard specification and as directed by TWAD Board Officers. 25 Earth work excavation in all strata for laying pipes including refillinig charges etc. complete as directed by TWAD Bd officers 26 Refilling with excavated earth including consolidatin etc. compete as directed by TWAD Bd officers 27 Provision for Cost and supply of 75 mm 6KSC Pipes etc., 28 Provision for Laying and jointing of PVC Pipes etc., P280/11b(1)) 29 Provision for Cost and supply 10.0.HP Openwell Submersible Motor (75LPM x 125m head) 30 Provision for Cost and supply 10.0.HP Panel Board 31 Provision for 10.0HP Submersible Motor Erection Charge etc 32 Provision for 65 mm Gl Pipe etc., 33 Provision for4 Sq.mm 3 Core Flat Cable etc., 34 Provision for 65 mm GM Gate Value etc. 46-5-2 35 Provision for M S Kiosk box including, labour charges etc. complete.and as directed 36 Provision for Cement Bed including, labour charges etc. complete.and as directed 37 Provision for Name Board Charges etc.,