| 1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | STP POLE 11/13 Mtr. Long |
| 3 | PCC POLE 8.5 / 9 Mtr. Long |
| 4 | ACSR Weasel Conductor |
| 5 | ACSR Dog Conductor |
| 6 | 33 KV XLPE Cable as per Required size |
| 7 | 11 KV XLPE Cable as per Required size |
| 8 | 33 KV CABLE JOINTING KIT INDOOR/OUTDOOR as per Required Size |
| 9 | 11 KV CABLE JOINTING KIT INDOOR/OUTDOOR as per Required Size |
| 10 | 11 KV CT/PT unit as per Required Size |
| 11 | 11 KV CT as per Required Size |
| 12 | 11 KV PT as per Required Size |
| 13 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) |
| 14 | Complete work of installing the electrical material received from the store center at the site. |
| 15 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 16 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 17 | Work of Fixing/Installing Single Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 18 | Work of Fixing/Installing Double Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 19 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Stablished electric poles installed as per RESPO norms. |
| 20 | Complete work of Laying/Installing ACSR DOG CONDUCTOR on the Stablished electric poles installed as per RESPO norms. |
| 21 | Complete work of Preparing the trench at the site and Laying/installing the 33 KV XLPE Cable as per RESPO norms. |
| 22 | Complete work of Preparing the trench at the site and Laying/installing the 11 KV XLPE Cable as per RESPO norms. |
| 23 | Complete work of Laying/Installing 33 KV XLPE Cable on the Stablished electric poles installed as per RESPO norms. |
| 24 | Complete work of Laying/Installing 11 KV XLPE Cable on the Stablished electric poles installed as per RESPO norms. |
| 25 | Complete work of Installing and Commissioning 33 KV Outdoor Jointing Kit as per RESPO standards. |
| 26 | Complete work of Installing and Commissioning 33 KV Indoor Jointing Kit as per RESPO standards. |
| 27 | Complete work of Installing and Commissioning 11 KV Outdoor Jointing Kit as per RESPO standards. |
| 28 | Complete work of Installing and Commissioning 11 KV Indoor Jointing Kit as per RESPO standards. |
| 29 | Complete work of Installing and Commissioning 11 KV CT/PT Unit on Stablished Double pole as per RESPO standards. |
| 30 | Complete work of Installing and Commissioning 11 KV CT as per RESPO standards. |
| 31 | Complete work of Installing and Commissioning 11 KV PT as per RESPO standards. |
| 32 | Complete work of installation of Stay Set Complete on Stablished Double pole & Single Pole of Line As per the RESPO standards. |
| 33 | Complete work of Earthing completing by establishing earthing road of Stablished Pole as per RESPO standards. In which decentralized material will be payable by the Contractor/Firm. |
| 34 | Complete work of Pole concreting on Stablished Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be payable by the Contractor/Firm. |
| 35 | Complete work of upgrading the line by Re-sagging / Tightening the loose Line & Re-Hight the Line at the site as per RESPO standards. In which decentralized material will be payable by the Contractor/Firm. |
| 36 | Complete work of cutting and pruning the branches of trees standing between the Line installed and shifting place/route. |
| 37 | Complete work of Strengthen the line installed at the site, Opening / Dismantling of the line and after completion of the line work, Complete work of tying the line as before. as per RESPO standards. In which decentralized material will be payable by the Contractor/Firm. |
| 38 | Complete work of straightening Electric Poles at an angle to the lines installed as per RESPO standards. In which decentralized material will be payable by the Contractor/Firm. |
| 39 | Supply of NUT & BOLT as per RESPO standards |
| 40 | Supply of DEAD & CLAMP as per RESPO standards |
| 41 | Supply of LT CLAMP as per RESPO standards |
| 42 | Supply of TOP CLAMP as per RESPO standards |
| 43 | Supply of DP CLAMP as per RESPO standards |
| 44 | Supply of X-ARM HOLDING CLAMP as per RESPO standards |
| 45 | Supply of F-CLAMP as per RESPO standards |
| 46 | Supply of SUSPENSION CLAMP as per RESPO standards |
| 47 | SUNDRIES ITEMS |
| 48 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 49 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)OLD & USED/Damage |
| 50 | STP OLD & USED / Damage |