| 1 | Repairs to RCC Roof School Building @ Onangudi PUMS (West Face,South Side Building )in OnangudiPanchayat |
| 2 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 3 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 4 | Block Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 5 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 6 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 7 | Provision For Electrification Works |
| 8 | Wiring provision for Future Upgradation works with Smart class facility |
| 9 | Light & Fan Point |
| 10 | 15Amps plug point |
| 11 | LED Light |
| 12 | Fan |
| 13 | Provision forPedestal for Keeping |
| 14 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 15 | Collection and supply of sandand fillingconveyanceto the siteand all labour charges for filling as per standard speecifications |
| 16 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 17 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\"and conveyance of all materials to site and all labour charges etc complete |
| 18 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 19 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 20 | Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed., |
| 21 | Provision for Cup Doards |
| 22 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 23 | Repairs to RCC Roof School Building @ Onangudi PUMS (West Face,North Side Building ) in OnangudiPanchayat |
| 24 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 25 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 26 | Block Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 27 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 28 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 29 | Provision For Electrification Works |
| 30 | Wiring provision for Future Upgradation works with Smart class facility |
| 31 | Light & Fan Point |
| 32 | 15Amps plug point |
| 33 | LED Light |
| 34 | Fan |
| 35 | Provision forPedestal for Keeping |
| 36 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 37 | Collection and supply of sandand fillingconveyanceto the siteand all labour charges for filling as per standard speecifications |
| 38 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 39 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\"and conveyance of all materials to site and all labour charges etc complete |
| 40 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 41 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 42 | Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed., |
| 43 | Provision for Cup Doards |
| 44 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 45 | Repairs to RCC Roof School Building @ Onangudi PUMS (East Face,West Side Building )in OnangudiPanchayat |
| 46 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 47 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 48 | Block Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 49 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 50 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 51 | Provision For Electrification Works |
| 52 | Wiring provision for Future Upgradation works with Smart class facility |
| 53 | Light & Fan Point |
| 54 | 15Amps plug point |
| 55 | LED Light |
| 56 | Fan |
| 57 | Provision forPedestal for Keeping |
| 58 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 59 | Collection and supply of sandand fillingconveyanceto the siteand all labour charges for filling as per standard speecifications |
| 60 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 61 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\"and conveyance of all materials to site and all labour charges etc complete |
| 62 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 63 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 64 | Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed., |
| 65 | Provision for Cup Doards |
| 66 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 67 | Repairs to RCC Roof School Building @ Onangudi PUMS (North Face,South Side Building) in OnangudiPanchayat |
| 68 | Chipping of concrete and roughening the surface |
| 69 | Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thickincluding cost and conveyance and all labour charges etc |
| 70 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 71 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 72 | Block Board Paintingtwo coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 73 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 74 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 75 | Provision For Electrification Works |
| 76 | Wiring provision for Future Upgradation works with Smart class facility |
| 77 | Light & Fan Point |
| 78 | 15Amps plug point |
| 79 | LED Light |
| 80 | Fan |
| 81 | Provision forPedestal for Keeping |
| 82 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 83 | Collection and supply of sandand fillingconveyanceto the siteand all labour charges for filling as per standard speecifications |
| 84 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 85 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\"and conveyance of all materials to site and all labour charges etc complete |
| 86 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 87 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 88 | Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed., |
| 89 | Provision for School Front Side Platform |
| 90 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 91 | Collection and supply of sandand fillingconveyanceto the siteand all labour charges for filling as per standard speecifications |
| 92 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 93 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\"and conveyance of all materials to site and all labour charges etc complete |
| 94 | Provision for Cup Doards |
| 95 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mmthick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thickfixed in the outside of the shutter using fevicol along with necessary furniture fittings,such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by theDepartmental Officers. The design pattern, water proof plywood, laminate sheet andother materials should be got approved from the Executive Engineer befoe use on work. |
| 96 | Repairs to RCC Roof Kitchen Shed at Onangudi PUMS in Onangudi Panchayat |
| 97 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm 50% New Tiles |
| 98 | Chipping of concrete and roughening the surface |
| 99 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 100 | Providing granolethic floor finish with ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 101 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 102 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 103 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 104 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 105 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 106 | Renovation to Boys Toilet at Onangudi PUMSin OnangudiPanchayat |
| 107 | Chipping of concrete and roughening the surface |
| 108 | Supplying and Fixing of creamic Tilesincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 109 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 110 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 111 | Plastering with cement mortar 1:5 mixto 12 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 112 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 113 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 114 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office |
| 115 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 116 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 117 | Supplying and fixing of RCC rings for Leach pit including all charges etc complete |
| 118 | 900mm Rings for Toilet |
| 119 | 600mm Rings for Urinal |
| 120 | Supplying and fixing of cover slabincluding all charges etc complete |
| 121 | 900mm Cover Slab |
| 122 | 600mm Cover Slab |
| 123 | Supply and Fixing of Indian type Water closet 580x440mm of approved quality |
| 124 | Provision for water Supply Arrangements |
| 125 | Supply and Providing 1000 Lit HDPE Tank |
| 126 | Supply and Fixing of 20mm dia PVC pipe |
| 127 | Supply and Fixing of 50mm dia PVC pipe |
| 128 | Supply and Fixing of 20mm dia PVC Coupler |
| 129 | Supply and Fixing of 20mm dia PVC Bend |
| 130 | Supply and Fixing of 20mm dia PVC Tee |
| 131 | Supply and Fixing of 50mm dia PVC Coupler |
| 132 | Supply and Fixing of 50mm dia PVC Elbow |
| 133 | Supply and Fixing of Water Tap |
| 134 | Renovation to Boys Toilet @ Onangudi PUMSin OnangudiPanchayat |
| 135 | Chipping of concrete and roughening the surface |
| 136 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 137 | Supplying and Fixing of creamic Tilesincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 138 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 139 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 140 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office |
| 141 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 142 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 143 | Supplying and fixing of RCC rings for Leach pit including all charges etc complete |
| 144 | 900mm Rings for Toilet |
| 145 | 600mm Rings for Urinal |
| 146 | Supplying and fixing of cover slabincluding all charges etc complete |
| 147 | 900mm Cover Slab |
| 148 | 600mm Cover Slab |
| 149 | Supply and Fixing of Indian type Water closet 580x440mm of approved quality |
| 150 | Provision for water Supply Arrangements |
| 151 | Supply and Providing 1000 Lit HDPE Tank |
| 152 | Supply and Fixing of 20mm dia PVC pipe |
| 153 | Supply and Fixing of 50mm dia PVC pipe |
| 154 | Supply and Fixing of 20mm dia PVC Coupler |
| 155 | Supply and Fixing of 20mm dia PVC Bend |
| 156 | Supply and Fixing of 20mm dia PVC Tee |
| 157 | Supply and Fixing of 50mm dia PVC Coupler |
| 158 | Supply and Fixing of 50mm dia PVC Elbow |
| 159 | Supply and Fixing of Water Tap |
| 160 | Renovation toTeachers Toilet at Onangudi PUMSin Onangudi Panchayat |
| 161 | Chipping of concrete and roughening the surface |
| 162 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 163 | Supplying and Fixing of creamic Tilesincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 164 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 165 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 166 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office |
| 167 | Exterior Emulsion over one coatincluding Cleaning, preparing the Surfaceincluding cost and conveyance of all materials to site and all labour charges etc complete(For OLD Wall) |
| 168 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 169 | Supplying and fixing of RCC rings for Leach pit including all charges etc complete |
| 170 | 900mm Rings for Toilet |
| 171 | 600mm Rings for Urinal |
| 172 | Supplying and fixing of cover slabincluding all charges etc complete |
| 173 | 900mm Cover Slab |
| 174 | 600mm Cover Slab |
| 175 | Supply and Fixing of Indian type Water closet 580x440mm of approved quality |
| 176 | Provision for water Supply Arrangements |
| 177 | Supply and Providing 1000 Lit HDPE Tank |
| 178 | Supply and Fixing of 20mm dia PVC pipe |
| 179 | Supply and Fixing of 50mm dia PVC pipe |
| 180 | Supply and Fixing of 20mm dia PVC Coupler |
| 181 | Supply and Fixing of 20mm dia PVC Bend |
| 182 | Supply and Fixing of 20mm dia PVC Tee |
| 183 | Supply and Fixing of 50mm dia PVC Coupler |
| 184 | Supply and Fixing of 50mm dia PVC Elbow |
| 185 | Supply and Fixing of Water Tap |
| 186 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |