|
| 1 | Sweeping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails includingclearing and disposal of waste papers daily,mopping of the office floors ,steps, staircases, handrails with scented cleaning agents twice a week, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobwebonce in a month collecting and disposing all the waste to outside of the Office complex, with all generalcleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (To be carried out daily) |
| 2 | Sweeping of the office floors (Flooring with Cement Mortar) steps, staircases, handrails includingclearing and disposal of waste papers daily,mopping of the office floors ,steps, staircases, handrails with scented cleaning agents twice a week, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobwebonce in a month collecting and disposing all the waste to outside of the Office complex, with all generalcleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (To be carried out daily) |
| 3 | Sweeping of the office lobby such as Cash collection center (Flooring with ceramic/ marble / granite tiles) steps,staircases, handrails including clearing and disposal of waste papers and debris daily, and mopping with scented cleaning agents twice a week , cleaning ofallpartition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaninginsidethe office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead,lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets,Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. |
| 4 | Sweeping of the office lobby such as Cash collection center (Flooring with Cement mortar) steps,staircases, handrails including clearing and disposal of waste papers and debris daily, and mopping with scented cleaning agents twice a week , cleaning ofallpartition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaninginsidethe office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead,lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets,Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. |
| 5 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. ( To be carriedout all working days). |
| 6 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping andcleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnatedwaterat periodic intervals, includingcarrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell.( 3 times in a day). |
| 7 | Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) |
| 8 | Water closets (IWC / EWC) |
| 9 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls) |
| 10 | General Disinfestations Work for the control of Cockroaches and other insects (spread of any virus) in office area ,once in 3 months using approved disinfectants, (4services/ year) |
| 11 | JCB Hiring for jungle clearance (per day) |
| 12 | Water tank cleaning |
| 13 | 5000 litres capacity |
| 14 | 2000 litres capacity |
| 15 | 1000 litres capacity |
| 16 | 500 litres capacity |
| 17 | Sump for storing cauvery water |