| 1 | Safe loading, carriage including unloading and proper stacking of following materials from Central Store Barabanki / JE Store to site of work |
| 2 | PCC Pole /STP Pole 8.5/11/13 Mtr long |
| 3 | 11kv Pin Insulator . |
| 4 | 11kv Disc Insulator . |
| 5 | 11kv X-ARM |
| 6 | MS Earthing Rod |
| 7 | Transformer 10/16 KVA |
| 8 | Transformer 25 KVA |
| 9 | Transformer 63 KVA |
| 10 | Transformer 100KVA |
| 11 | ABC Cable 3x95 SQ. MM. |
| 12 | ABC Cable 3x50 SQ. MM. |
| 13 | ABC Cable 1x25+1x16 SQ. MM. |
| 14 | 11 KV XLPE Cable |
| 15 | ACSR Weasal Conductor |
| 16 | LT D.B. Box |
| 17 | 11KV CT/PT Unit |
| 18 | 11 KV Metering Cubical/pilfer |
| 19 | Stay Set Complete |
| 20 | Other Line Material |
| 21 | Safe carriage inclunding unloading proper stacking from store center barabanki to dump store of work site for maximum uto 1 to 6 no . PCC/STP Poleas sanction estimate (pole quantity less then full capacity of carriar vehicle bot carriage chargeses will be paid as per full capacity in a job.) |
| 22 | Dragging of pole from JE Dump Store to site |
| 23 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide, anchor plate, thumble turn buckle andstay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 24 | Stringing and sagging of 11 KV line with ACSR Weasal Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 25 | Pipe Earthing ( Boring type) |
| 26 | Installation of Mounting of Following capacityof Transformer including its connection between 11 KV and LT Line mounting of copper L-Pieces, provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) |
| 27 | Munting of 10/16 KVA Tranformer |
| 28 | Munting of 25 KVA Tranformer |
| 29 | Munting of 63 KVA Tranformer |
| 30 | Munting of 100 KVA Tranformer |
| 31 | Installation of fixing 11 KV CT/PT with required meterial. |
| 32 | Installation of fixing 11 KV Pilfer Unit with required meterial. |
| 33 | Errectionof Substation type double pole with PCC Pole 8.5 Mtr. Long including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 34 | Errectionof singlePCC /ST Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. |
| 35 | Stringing and Sagging of LT 1x25 ABC Cable (LT ABC Cable will be provided by the department) |
| 36 | Stringing and Sagging of LT 3x50 ABC Cable (LT ABC Cable will be provided by the department) |
| 37 | Stringing and Sagging of LT 3x95 ABC Cable (LT ABC Cable will be provided by the department) |
| 38 | Installation of D.B. Box |
| 39 | Earthing of pole with MS Earthing. |
| 40 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 41 | Nut & Bolt |
| 42 | Different size of lug |
| 43 | Clamp for Top/ Dropper and T-off Channel etc. |
| 44 | GI Pipe 3\"&4\"\" DIA |
| 45 | Top Channel 11 kv |
| 46 | T-off Channel 11 kv |
| 47 | Sub-Station Base Angle |
| 48 | Dead End Clamp with J-Hook |
| 49 | Suspension Clamp |
| 50 | Peircing Connectores /Clamp |
| 51 | Looping and Choopping of tree branches in laying on the route of line. |
| 52 | Concreating and pilinthing of ST& PCCPole 18x24 CM. |
| 53 | Laying of 11kv XLPE Cable 3x70, 120,185 Sq.By MM Manually |
| 54 | Testing ofXLPE Cable all size. |
| 55 | Hosting of Cable all size. |
| 56 | Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel Substation base angle etc. |
| 57 | Looping of cable and mounting of pole. |
| 58 | Other Line Material |