| 1 | Earth work in hard soil withen 50m. initial lead and 1.5m. Initial lift including rough dressing and breaking the clods to maximum 5cm. To 7cm. Laying the layers not exceeding 0.30m. Indepth etc complete. |
| 2 | Providing and filling clean dry sand of approved quality from approved quarryin foundation andplinthin6\"thicklayerwellwateredandrammedincl.cost,conveyance,royalties .taxes of all materials etc. |
| 3 | C.C.(1:4:8) using 40mm HG metal of approved quality from approved quarry incl. hoisting, compactingcuring,finishingtheexposedsurfacesmooth,dewatering,shoring,shutteringif necessaryatthetimeoflayingconcretewithcost,conveyance,royalty&taxesofall materials,cost of labour and T&p etc. all complete as per the direction of E.I.C. |
| 4 | 2.5 cm. Damp proof course with C.C. (1:2:4) using 12mm. Size hard broken granite Chips of approved quality from approved quarry incl. hoisting, compacting curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials,cost of labour and T&p etc. allcomplete as per the direction of E.I.C. |
| 5 | Fillinginfoundationandplinthwithexcavatedmaterialsincludingwaterandrammingas directed by the Engineer-in -charge. |
| 6 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C(Column Bases) |
| 7 | Plinth band |
| 8 | For beam and column |
| 9 | Lintel |
| 10 | Chajja |
| 11 | Roof Slab |
| 12 | Cutting, straightening, coiled or bent upT. S. rodfor R.C.C. work incl. bending, binding & tying the grills and placing in proper position with cost, conveyance,taxes of binding wire 18 to 20 gauge and T.S. rod, cost of all labour & T&P etc complete as per the direction of E.I.C. |
| 13 | Flyash brick masonry in C.M. (1:6) using brick of size 23cmx11cmx 8cm of crushing strength not less than 75kg/cm2 with dimentional tolerance plus minus 8% after immersing the bricks forsixhoursbefouruseincl.lowering,placinginposition,wateringandcuringandcost,conveyance, royalties and taxes of all materials, cost of labour & T&P etc. complete as perthe direction of E.I.C.(For foundation & plinth). etc all complete. |
| 14 | Insuperstructure |
| 15 | Supplying, fitting and fixing steel Angle iron door and windowsas per approved design and drawing including all cost of materials and labour etc complete as per direction of Engineer incharge. |
| 16 | Supplying and fixing of G.I Pressed G.I Door assembly with polymer powder coated includingthe cost of all materials and fitings etc. complete. |
| 17 | Labour for fitting and fixing doors and windows etc.all complete. |
| 18 | 6mm thick cement plaster (1:4),finished smooth to R.C.C. surfaces after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials,labour and T&P etc complete as per the direction of E.I.C. |
| 19 | 16mmthickcementplaster(1:6),finishedsmoothtobrickmasonryworkininsidesurface after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C. |
| 20 | 12mm thick cement plaster (1:6) for brick masonry workin outside surface after racking outjointsincl.watering,curingetc.completewithcost,conveyance,royalties&taxesofall materials, labour and T&P etc complete as per the direction of E.I.C. |
| 21 | 20mmthickgradingplaster(1:4),finishedsmoothoverroofslabaftercleaningthesurface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials,labour and T&P etc complete as per the direction of E.I.C. |
| 22 | Fixing Kota tiles in Dados on 12 mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl.cost of tile etc all complete. |
| 23 | Fixing Kota tiles in floor on 25 mm thick cement plaster (1:1) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl.cost of tile etc all complete. |
| 24 | Distemperingtwo coats with approved shade over a coat of oil bound primer incl. cost of allmaterial, labour and T&P etc. complete. |
| 25 | Painting two coats with approved paint to doors and windowsover a coat of primer incl. costof all material,T&P and labour etc complete. ( for Iron work ) |
| 26 | Weather coat painting two coats with approved shade over a coat of oil bound primer incl.cost of all material,T&P and labour etc complete. |