| 1 | Earth work in excavation for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. PWD SOR S.I.No. 251/2022-23) |
| 2 | P/L PCC in 1: 4; 8 (1 Cement : 4 Fine Sand : 8 graded brick ballast 40 mm nominal size) including supply of all materials, labour & T&P etc. reqd. for proper completion of work as per direction of E/I. (PWD SI No.275/ 2022-23) |
| 3 | First class B/W in 1 : 4 Cement and C/Sand mortar in foundation and Plinth including supply of all materials, labour and T&P etc. required for proper completion of the work(PWD SI No.309(b)/ 2022-23) |
| 4 | 2cm (3/4\") thick Damp proof course with cement and approved course sand 1 : 2 with and including water proofing materials as ordered by the Engineer-in-charge in the proportion as specified by the manufactures including supply of all material, labour and T&P etc. required for proper completion of the work including proper curing and shuttering as necessary. (PWD SI No 360/ 2022-23) |
| 5 | First class B/W in 1 : 4 Cement and C/Sand mortar in arches including shuttering and centering including supply of all materials, labour and T&P etc. (PWD SI No.314(3)/ 2022-23) |
| 6 | 12 mm. thick plaster With 1:3 cement & and coarse sand Mortar.. UPPWD S.O.R. S.I. No.583/2022-23 |
| 7 | R.C.C. Work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone grit in the proportion of 1:1.5:3 in wall excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Binding wire cost being included in this Item.SI-284+Diff /SOR/2022-23) |
| 8 | Mild steel or Iron in plain work such as reinforced concrete or reinforcement brick work (When not wrought to included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level.UPPWD S.O.R. S.I. No.504/2022-23) |
| 9 | M.S. or I/W such in heavy size such as as trusses, built up gates record racks, roof work, gate etc wrought to reqd formi/c drilling holes rivet ling or welding where necessary and their firing reqd for proper completion of the work.PWD SOR S I No 503/2022-23 |
| 10 | Construction of embankment with approved material obtained from available land as permitted and approved by Engineer-in-Charge and as per Technical Specification Clause 301.3.3.4.1, with all lifts and and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification clause 301.5 including carting of earth beyound 5 Km distance including royalty of earth PWD SOR S.I.No. 253/2022-23 |
| 11 | Extra for compaction of earth work in embankment under optimum moisture condition to give at least 95% provter desity (DAR-2019:16.2 based) P.W.D (Sunctioned Rate) |
| 12 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 13 | Supply and layingof 80 mm thick Rubber moulded Zig Zag shaped mechanically compressed inter locking cement concrete pavers blockmanufactured by high pressure and controled vibraton machine having plan dimention dimension 200x(160+120mm) with miniumum 5 mm thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30 MPa, 4.50 kg/No. in bed 4 cm. thick sand including all material, labour, T&P etc. required for proper completion of work and also d Rate) (75% Grey and 25% Red interlocking tiles use) |
| 14 | Painting or varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & Two coats of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T & P etc. required for proper completion of work, paint to be used shuld confirm to the I.S.I. No. 103 1950 PWD SOR S I No 641+642/2022-23 |
| 15 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacture, over the plasterd wall surface to prepare the surface even and smooth complete SOR 2022-23 Item No- 13.8 chapter 15 |
| 16 | Finishing walls with three coats of waterproofing cement Paint of approved make, and quality on new work with two coats to give an even shade i/c supply of all mat lab and T&P etc. reqd for proper completion of the work. PWD SOR S I No 660+661/2022-23 |
| 17 | Marking of 4 wheeler or two wheeler parking with Hot applied thermoplastic Compound 2.5 mm thick including reflectorising glass beads@ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC-35 the finished surface to be level uniform and all complete. Road Marking (Non-Schedule item)SOR 2022-23 |
| 18 | Disposal of malwa upto 2 Km including loading unloading including all complete. SOR Chapter -3 S I -2/2022-23 |