Name of Work: Replacement of corroded pipelines in Lactam plant, Ammonia Handling and Main Tank Farm areas in Petro Plants, FACT UC.
Sl. No.
Item Description
1
Replacement of corroded pipelines in Lactam plant, Ammonia Handling and Main Tank Farm areas in Petro Plants, FACT UC.
2
Fabrication & welding of CS pipelines for repair/replacement of damaged pipelines/ installing new lines/ modification with valves & fittings/ re-routing of various pipelines, etc. having different thickness in petro plants - sizes of pipes up to and including 50 NB at all elevations and all locations. The activity also includes painting of the fabricated pipe line with one coat of inorganic zinc silicate primer and two coats of acrylic aliphatic polyurethane finish paint / two coat of heat resistant aluminium paint after thorough cleaning.
3
Fabrication & welding of CS pipelines for repair/replacement of damaged pipelines/ installing new lines/ modification with valves & fittings/ re-routing of various pipelines, etc. having different thickness in petro plants - sizes of pipes vary from above 50NB and up to and including 350NB at all elevations and all locations. The activity also includes painting of the fabricated pipe line with one coat of inorganic zinc silicate primer and two coats of acrylic aliphatic polyurethane finish paint / two coat of heat resistant aluminium paint after thorough cleaning.
4
Fabrication and welding of pipelines (LTCS) for repair/replacement of damaged pipelines/ installing new lines/ modification with valves & fittings/re-routing of various pipelines, etc. having different thickness in Petro plants # sizes of pipes vary from 15 NB and up to and including 200 NB at all elevations and all locations. The activity also includes painting of the fabricated pipe line with one coat of two-pack polyurethane holding primer and two coats of high build polyurethane coating finish paint after thorough cleaning.
5
Fabrication and welding of Stainless steel pipelines for repair/replacement of damaged pipelines/ installing new lines/modification with valves & fittings/ re-routing of various pipelines, etc. having different thickness in petro plants – sizes of pipes up to and including 350 NB at all elevations and all locations.(TIG welding)
6
Erection of the fabricated pipelines (Items No.1,2,3&4) with necessary fittings like valves, flanges, etc. after dismantling the existing old pipelines, wherever necessary.
7
Radiography of weld joints on pipe of various thickness
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.