| 1 | 11/0.4KV, 100 KVA S/stn |
| 2 | Prov. 11/0.4 KV, 100KVA transformer |
| 3 | Steel tubular pole 9m Long |
| 4 | RCC Muff with concrete filling |
| 5 | AAAC7/3.15mm |
| 6 | X-Arm (Channel iron 100x50x5mm) Length 2800MM fortransformer bed & incomer line. |
| 7 | X-Arm (Channel iron 460x100x50mm) supporting main channel |
| 8 | Transformer Belting and Knee Bracing |
| 9 | A.I (2800x50x50mm) |
| 10 | A.I (460x35x35mm) |
| 11 | A.I (950x50x50mm) |
| 12 | A.I X-arm for lightening arrestor(2800x50x50mm) |
| 13 | G.O. Switch switch 400 A Complete |
| 14 | G.O Switch handling Support C.I 460X75X40MM |
| 15 | 11 KV D.O Fuse Unit |
| 16 | Lightening Arrestor 9.5 KV 5 KV |
| 17 | Disc insulator Fitting |
| 18 | Stay Set complete |
| 19 | Stay Wire 7/3.15mm @6Kg./Stay set |
| 20 | Pipe Earthing set Complete(Reearthing 5 No) |
| 21 | LT Distribution Panel Box for 100KVA DTR With MCCB ( Replace damage Lt Box 7 No) |
| 22 | MS Half Clamps (M.S Liat 50x6mm) |
| 23 | MS Full Clamps |
| 24 | M.S. Nut & Bolts Off Sizes |
| 25 | Gl. Thimble |
| 26 | Danger Plate |
| 27 | Barbed Wire |
| 28 | Comman Pole 8 Mtr Long |
| 29 | LT Cable 1.1 kV XLPE Cable ( 3.5 core ) 120 mm2 |
| 30 | Aluminium Paint |
| 31 | M.S.A.I (450x50x50mm) |
| 32 | C.I for fuse unit/AB Switch (2800x75x40mm) |
| 33 | CT-PT 100/25 Combint Unit (7 No for replace damage CT-PT outdoor unit on variour IPH schemes) |
| 34 | HT Meter 100/25 (7 No for replace damage HT Meter on variour IPH schemes) |
| 35 | Control Cable 2.5mm PVC(1.1 kV, 12C, HR FRLS, Cu, Un-Screen) |
| 36 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing (Replace damag 5 No) |
| 37 | Erection charges for DTR and other material |
| 38 | Transportation charges |
| 39 | 11/0.4KV, 25KVA to 63 KVA S/stn |
| 40 | Prov. 11/0.4 KV, 63 KVA transformer |
| 41 | Prov. LT Distribution Panel BoxWith MCCB(With MCCB(100A, 10KA,)for 63 KVA |
| 42 | Prov. PVC cable 31/2 core core 95mm |
| 43 | Prov. PVC cable 31/2 core core 50mm |
| 44 | Prov. ElectroniceTrivectorMeter 3-phase, 4 WIRE/ 100/5 A CT type |
| 45 | Prov. Aluminium Thimbe 95mm |
| 46 | Prov. M.S. Nut & Bolts Off Sizes |
| 47 | Prov. 3 nos earth set |
| 48 | Prov. 11KVG.O. Switch unit complete for 63 KVA DTR |
| 49 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing |
| 50 | Aluminium Paint |
| 51 | Erection/Dismental charges for DTR and other materialcomplete in all respect. |
| 52 | Transportation charges |
| 53 | 11 KV HT LINE |
| 54 | ST Pole 9Mtr. Long W/L 200 kg |
| 55 | RCC Muff of 2000 mm length |
| 56 | Pole Top Bracket (100X100X50) mm |
| 57 | CI 1270X100X50X5 mm for single pole |
| 58 | A.I. Knee Bracing Set 2X(750X50X50) mm for single Pole |
| 59 | A.I. X-Arm 2X (2125X50X50) mm for double Pole |
| 60 | Belt set MS AI 1800 X50X50X6 for double Pole |
| 61 | C.I. X-Arm 2X (460X75X40) mm for SupportingGO Switch handling |
| 62 | C.I. X-Arm 2X (2800X75X40) mm for Supporting DO Fuseunit & GO Switch |
| 63 | A.I. 2X(2400X75X40x5) for double Pole |
| 64 | C.I. X-Arm (2340X100X50x6) mm for double Pole |
| 65 | 11 kV Pin Insulator (Porcelain 12KV, 10KN) |
| 66 | Disc insulator set (Porcelain 12KV, 90KN) including Dead End Clamps |
| 67 | HT Stay Set complete includingGuy Assembly ,Helicallyfitting |
| 68 | GI Wire 8 SWG for (along 2 wire length river crossing Guarding across the River) |
| 69 | Coil Earthing for PCC / Steel Pole |
| 70 | Danger Plate(250X200X1.6 mm) |
| 71 | 11 KV G.O Switch |
| 72 | 11 kv D.O. Fuse unit |
| 73 | Earth wire Clamp |
| 74 | M.S. Nuts and Bolts (Off Sizes) |
| 75 | Barbed Wire |
| 76 | Aluminium Paint |
| 77 | AAAC 7/3.15MM² (Reconducting conductor off size to AAAC 7/3.15 mmfor JSV works new & old off size conductor |
| 78 | Erection chargescomplete in all respect |
| 79 | Transportation charges |
| 80 | Dismentalment of existing off size conductor |
| 81 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |