)DCW estimate for 1no insertion pole as per request of Thiru.Rajakumar at Melpuram under Puthenchanthai Section. 2)DCW estimate for LT pole shifting as per the request of The Executive Officer Town Panchayat Edaicode under Puthenchanthai Section. 3)DCW estimate for HT pole shifting as per request ofThiru.Jaisingh at Nediyalavilai, Anducode under Puthenchanthai Section. 4)DCW estimate for LT pole shifting as per the request of EO/TP Edaicode under Puthenchanthai Section. 5)DCW estimate for LT line shifting as per request of EO/TP Edaicode under Puthenchanthai Section. 6)DCW estimate for LT line shifting as per request of EO/TP Edaicode under Puthenchanthai Section. 7)DCW estimate for service wire pole to pole shifting as per request of Thiru.Selvaraj at Malaicode under Puthenchanthai Section. 8)DCW estimate for LT sidearm with stud as per the request of Tmy.Jabalini at Nullikadu under puthenchanthai Section. 9)DCW estimate for 1no LT pole dashing vehicle no AA2390 Thiru.Raja, Karamakudi, Puthukottai under Puthenchanthai Section. 10)DCW estimate for shifing of 1no service in SC No:185-010-712 Pervoorkoil SS to Iykianager SS as per request of The President, Lekshmi Amman Tenple kallupalam under Puthenchanthai Section. 11)DCW estimate for shifting of 1no 8mtr PSC pole as per the request of Tmy.A.lovisha, Neduvilai at Edaicode under Puthenchanthai Section. 12) pole as per request of thiru.Aruldhas at Melpuram under Puthenchanthai Section. 13)DCW estimate for shifting of 1nos 8mtr PSC pole as per the request of The Bishop, CSI Church, Madathuvilai at Edaicode under Puthenchanthai Section. 14)DCW estimate for shifting of 1no 8mtr PSC pole by providing 1no 8mtr PSC pole as per the request of Tmy.S.Helan Jacklin Pappa, Pallivilai veedu at Kuttaicode under Puthenchanthai Section. 15)DCW estimate for shifting of LT line and 1no 8mtr PSC pole as per request of The President, Devicode Village Panchayat at Nilavani area under Puthenchanthai Section. 16)DCW estimate for LT 3wire line dismantling and redoing as per the request of Thiru.Devadas at Kuzhithurai under Puthenchanthai Section. 17)DCW estimate for shifting of 1no 8mtr RCC pole by providing1no 8mtr PSC pole as per the request of Thiru.Suresh kumar, Suresh Cottage, Puthenvilai at Melpuram under Puthenchanthai Section. 18)DCW estimate for shifting of the 9.14 mtr RCC pole as per the request of Thiru.M.S.Vishnu Sachiv, Sree Pathdram, Eenthikala at Anducode under Puthenchanthai Section. 19)DCW estimate for deviation of the LT line by providing 1no new 9mtr PSC pole as per request of Thiru.S.Sundar Raj, Kannaracode veedu at Edaicode of Puthenchanthai Section. 20)DCW estimate for shifting of LT line and 2no 8mtr PSC pole as per request of The President, Devicode Village Panchayat at Thazhmana Village area under Puthenchanthai Section. 21)Natural Calamity estimate for the replacement of damaged 1no 8mtr PSC pole at loc no:FI/15 of Vattiyankarai SS 100 KVA due to fallen of coconut tree under Puthenchanthai Section. 22)Natural calamity estimate for the replacement of damaged 1no 8mtr PSC pole at loc no:FII/45 of Puthuveetukonam SS I 100 KVA due to fallen of coconut tree under Puthenchanthai Section. 23)Eos to 1no HSC TYSY as per request of Thiru.Ajin at Anducode under Puthenchanthai Section. 24)Eos to 1no HSC TYSY as per request of Thiru.justin John at Nilavanvilai under Puthenchanthai Section. 25)Eos to 1no TF IA new service connection to Tmy.Thushara at Edaicode under Puthenchanthai Section. 26)Eos to 1no commercial service as per request of Thiru.Rabinson at Poovattuvilai under Puthenchanthai Section. 27)Eos to 1no TF 3a1 three phase additional load service to Thiru.J.Jebadhas at Anducodeunder Puthenchanthai Section. 28)Eos to 1no TF IA three phase additional load to Tmy.Lalithabai at Anducode under Puthenchanthai Section. 29)Eos to 1no TF VI service connection to Thiru.Thanka das at Edaicode under Puthenchanthai Section. 30)Eos to 1no TF IA service connection to Thiru.D.Joy at Edaicode under Puthenchanthai Section. 31)Eos to 1no TF IA service connection to Thiru.T.Ratheesh at Devicode under Puthenchanthai Section. 32)Eos to 1no TF IA service connection to Tmy.S.Sasikala at Manjalimoodu under Puthenchanthai Section. 33)Eos to 1no TF V service connection to Thiru.Sreekumaran Nair at Edaicode under Puthenchanthai Section. 34)Eos to 1no TF V service connection to Indus Tower Limited under Puthenchanthai Section. 35)Eos to 1no TF 2A service connection to The President, Village panchayath at Devicode under Puthenchanthai Section. 36)Eos to 1no TF 2A service connection to The President, Village panchayath at Maruthancode under Puthenchanthai Section. 37)Eos to 1no TF IA service connection to Thiru.Premji at Mylanchivilai under Puthenchanthai Section. 38)Improvement estimate for shifting of LT line and 1no 8mtr PSC pole in Madatharakkalvilai at Elampalaivilai area under Puthenchanthai Section. San Nos.1)696/A31/214/22-23 dt:31/03/23, 2)696/A31/54/23-24 dt:28/06/23, 3)696/A31/12/23-24 dt:03/05/23, 4)696/A31/24/23-24 dt:12/05/23, 5)696/A31/25/23-24 dt:12/05/23, 6)696/A31/26/23-24 dt:12/05/23, 7)696/A31/30/23-24 dt:16/05/23, 8)696/A31/38/23-24 dt:05/06/23, 9)696/A31/47/23-24 dt:21/06/23, 10)696/A31/153/23-24 dt:02/01/24, 11)696/A31/135/23-24 dt:17/11/23, 12)696/A31/139/23-24 dt:22/11/23, 13)696/A31/151/23-24 dt:18/12/23, 14)696/A31/161/23-24 dt:19/01/24, 15)696/A31/162/23-24 dt:19/01/24, 16)696/A31/50/23-24 dt:21/06/23, 17)696/A31/107/23-24 dt:06/10/23, 18)696/A31/100/23-24 dt:20/09/23, 19)696/A31/93/23-24 dt:04/09/23, 20)696/A31/163/23-24 dt:19/01/24, 21)79.881/S/38/23-24 dt:06/08/23, 22)4070108/S/89/23-24 dt:07/09/23, 23)626/J316/04/23-24 dt:21/06/23, 24)626/J316/03/23-24 dt:07/06/23, 25)626/J316/06/23-24 dt:28/07/23, 26)626/J316/02/23-24 dt:15/05/23, 27)626/A31/143/23-24 dt:02/02/24, 28)626/A31/11/23-24 dt:30/08/23, 29)626/A31/34/23-24 dt:03/10/23, 30)626/A31/21/23-24 dt:21/09/23, 31)626/A31/22/23-24 dt:21/09/23, 32)626/A31/10/23-24 dt:30/08/23, 33)626/A31/55/23-24 dt:27/11/23, 34)626/A31/147/23-24 dt:02/02/24, 35)626/A31/28/23-24 dt:26/09/23, 36)626/A31/29/23-24 dt:26/09/23, 37)626/J316/05/23-24 dt:05/07/23, 38)656/E3/590/23-24 dt:15/09/23.