| 1 | Dismantling of old damaged side rubber seal from gate leaf of R.G 12 x 5 m - 1 No . Supplying & fitting new L type side rubber seal confirming to IS 11855-1986 (Updated) size 90x15x40x18 - 5.96 mtr and G.I. bolt M-20x90 - 47 Nos and dismantling of old damaged bottom rubber seal from gate leaf of R.G. 12 x 5 m -1 No. Supplying & fittingnew flat type bottom rubber seal confirming to IS 11855-1986 (Updated) size 90x15 mm - 12.2 mtr and G.I. bolt M20x80 -97 Nos with double washer, including cost of material, sundry material and labour charges with leads & lifts at site etc. |
| 2 | Dismantaling of damaged wire rope, wire rope socket of 20MT cap hoist -1 No . Fixing new wire rope of Dia 24 mm - 75 Mtr length in 4 No of falls, confirming to IS 2266. into Wire rope socket - 4 Nos, confirming to IS 2485. by Zinc (IS 209 ) pouring and carrying load test. Applying Cardium compound (Servocoat 140) - 9 Kg with satisfactory test & Trial, including cost of material, sundry material and labour charges with leads & lifts at site etc for Gate No. 1,3,4,5,11,12 & 14.(07 Nos.) |
| 3 | Draining of Old Oil from RGB & filling with Gear oil GX-90 -8 Ltr, Cleaning Gear train by removing old Grease & Applying M.P. Grease grade no. 150 - 10 Kg to Gear train, Pedastal, Drum axle,Trunion pin, Locking box and Lifting bracket pin etc. and refilling of oil of Radial gate of 20 MT cap hoist -1 No., including cost of material, sundry material and labour charges with leads & lifts at site etc |
| 4 | Dismantalling of damaged Dial Indicator assembly of 20 MT capacity Hoist - 1 No. of Radial gate Cap & replacing by new Dial Indicator assembly along with calibration.including Sundry material & Labour charges. |
| 5 | Dismantalling & Replacing old damaged Brake Liner 200mm Ø - 1set by new one of 20 MT Cap Hoist of Radial Gate,including cost of material, sundry material and labourcharges with leads & lifts at site etc complete. |
| 6 | Dismantalling & Replacing old damaged Brake Coil - 1 No set by new one (200 mm Ø ) of 20 MT Cap Hoist of Radial Gate, including cost of material, sundry material and labourcharges with leads & lifts at site etc complete. |
| 7 | Removing Old Cardium Compound of Wire rope of 20 MTcap hoist - 1 No by cleaning agent & Applying new CardiumCompound (Servocoat 140) - 9 Kg, including cost of material, sundry material and labour charges with leads & lifts at site etc complete,for Gate No. 2,6,7,8,9,10 & 13.(07 Nos.) |
| 8 | Overhauling to GateHoistassy 20 ton Cap & Gear Train assy by Dismantelling and Reassembling of Gear train to achieve perfect alingnment by way of Replacement of flexible coupling bolts & Rubber bushes, replacement of Muff coupling bolts & nuts, complete job , |
| 9 | Filling of Mastic asphalt (Mixture of bitumen, Saw dust and sand) at Trunion shoe-end arm joint and End armhorizontal girder joint of R.G. 12 x 5 m -1 No as perdirection of engineer incharge , including cost of material,sundry material and labour charges with leads & lifts atsite etc. |
| 10 | Loosening wire rope of Dia 24 mm from rope drum of 20 M cap hoist & balancing of wire rope and fixing it on rope drum with satisfactory test and trial. Complete job with material, sundry material & labour charges for Gate No.2,6,7,8,9,10 & 13. (07 Nos) |
| 11 | Transportation Charges |