| 1 | Excavation in soil mixed with moorum/shingle, kankar requiring the use of special tools & plant such as pick axes sabbals etc.foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. |
| 2 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. |
| 3 | M-150 Brick work in 1:4 with Cement and coarse sand including supply of all material, labor T & P etc. required for proper completion of work. |
| 4 | 12MM Thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not including 80mm in girth and finished even and smooth. No extra for missing any additive. 1 cement : 4 Coarse Sand. |
| 5 | Supply and fixing of green grass sheet for flooring as per direction of engineer-in-charge etc. all complete. |
| 6 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors. |
| 7 | Red sand stone work for wall lining etc. (veneer work) 30mm thick in cement mortar 1:3 (1 cement : 3 coarse sand) including camping jointing in white mortar 1:2 (1 white cement : 2 stone dust) with and admixture of pigment matching the stone shade. |
| 8 | Mild Steel and Iron work of small size and section such as holding down woods, hold fasts tierods, grating etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of grill/stairs case railing. |
| 9 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0,50 mm (base metal of minimum 0.45 mm thickness with total coaling thickness of 0.05mm) with zinc coating 120 grams por sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polvester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should supplied in single length upto 124 metre or as desired by Engineer-in-charge. The sheet shall be fixeda using self driling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 10 | Supply and laying P.V.C. pipe 110 mm dia I.S.I. make. |
| 11 | Providing and fixing glazing in aluminum door, window, ventilator shutters and partitions etc. with EPDM rubber/neoprene gasket etc. complete as per (Cost of aluminum snap beading shall be paid in basic item) : (iii) with float panes of 8.0mm thickness. |
| 12 | Supply and fixing of Rolling M.S. Shutter for size 75x40x4 and 3.50m long including fixing in foundation with 1:3:6 cement concrete coarse sand and stone grit 20mm size including cost of all material, labour T&P complete. Required for proper completion of work. |
| 13 | Finishing walls putty approved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all materials. |
| 14 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat. |
| 15 | Painting two coat other primer on steel with sianth paint including etc all complete. |
| 16 | Supply and fixing of light fitting switch board. |
| 17 | Supply and fixing of light point. |
| 18 | Supply and fixing ceiling fan etc. all complete. |
| 19 | Supply and fixing of 25 watt. CFL etc. all complete. |
| 20 | Making ornamental painting with special design make by specialist painter laying of two coat birla white putty and design by asian paint including all material etc. all complete. |
| 21 | Sub Total (A) |
| 22 | Add / Deduction For Estimate Figure Amount Match |
| 23 | Grand Total |