|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead For thickness of tiles 10mm to 25mm. |
| 2 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. |
| 3 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish 20mm thick. |
| 4 | Providing and fixing 1st quality standard white, grey, ivory, fume red brown, light green, light blue and other light shades glazed tiles confirming to IS : 13753 & IS :15622 of size 200mm x 300mm in walls, floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (excluding the cost of cement plaster on walls and pillar). |
| 5 | ExtraforusingMarbleprinted/Graniteshadeordarkshadetilesinsteadofwhite,grey,ivory,fumeredbrown,lightgreen,lightblueandotherlightshadesinglazedtilesandMATfinishedtiles. |
| 6 | Extraforusingsize above 200x300mm in glazed tiles and for using 400mm x 400mm MAT finishedtiles in place of 300mm x 300mm size. |
| 7 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 8 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried. Applying Epoxy primer on the exposed steel bars. Applying Epoxy hardener and resin mix (as per manufectured\"s specification) on concrete and steel bars with brush. Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day. Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete. Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 9 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 10 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stoneaggregate 20mm nominal size). |
| 11 | Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead Of area 3 square meter and below. |
| 12 | Half brick masonry in Superstructure , above plinth level upto floor Vlevelusing bricks of designation 75Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 13 | Supply of Beldar |
| 14 | Providing & laying broken glazed titles on roof ( broken glazed tilesnot less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg ofVG-40 (30/40 )grade and 0.30 Kg/Sqm. OfVG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. |
| 15 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with non-woven polyester mattconsisting of a coat of bitumen primer for bitumen membran @ 0.40 Itr/sq.mt. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane.3 mm thick |
| 16 | Carriage of Building Rubbish Stone metal (Grit and ballast etc.) including loading and unloading with all lead. |