Tender For Zone-1 Ward No. 78 Necessary Repair Work In Motiganj Primary School Kachhari Ghat Ancient Belanganj., 1 Cleaning of the site for warkable etc. All complete. (Non Scheduled) 2 Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) 3 Earth work in Cutting or in embankment in rodinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required lavels and slops and also including 1.5 m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge etc. all complete. (20-Chapter PWD.SCH.No.253(a))PWD Sheduled 2015 4 Providing and laying cement concrete in 1:5:10 (1 cement :6 fine sand 12 stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter S.I. No. 01) 5 Providing and laying D.P.C. 40cm. Thick with cement concrete consisting of one part cement 1.5part of coarse sand and three part of approved 10mm grade stone grit and including water proofing material as directed by the engineer-in-charge in the proportion as specified by the manufacturer. {Chapter No.07 Si.No.1} 6 Class-150 brick work in 1:4 Cement and Coarse sand 1.25 fineness modulus mortor in Super Structure including supply of all material, labour and tolls and plants etc. All complete. (S.I. No. 303+309) 7 RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)(5-Chapter S.I. No.-8) 8 Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) 9 12mmcement plaster in single coat on rough site of single of half brick wall for interior plastering up to floor to level including internal rounded angles not excluding 80mm in girth and finished even and smooth. (b) 1cement : 6 Coarse sand. (Chapter No.13 Si.No. 1) 10 Mild steel of iron in heavy size such as trusses built up gates record reck, roof work gates etc. brought to required form including drilling holes revitting are welding where neccesary, and also including supply of steel bolts , nuts wastage etc. and there fixing required for completion of the work. 11 Pro/iding and fxing lSl marked flush door shutters conforming lo lS : 2202 (Part l) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.including lsl marked Stainless Steel butt hinges with necessary screws. (Excluding cost of Flttings) (a) 30mm thick. {Chapter No.09 } 12 Supply and Fixing Oxided Iron Fitting etc. all complete (None Scheduled) 13 Providing and fixing of door & ventilater etc. all complete. (DSR No. 9.6.1) 14 Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work{Chapter No.15 } 15 Paint of the two coat over priming coat including cost of priming coat new steel gril etc. all complete.(15-Chapter Sr.No.1+8) 16 Providing of Laying of Vitrified floor tiles without lean concrete of 5OOxsOOmm sizes (ihickness to be speclfied by the manufactureo wlth water absorption less than O.OS% anO conforming to lS; 15622, of approved make, ln all coloLrrs and shades, l6id on 20mm thick cement mortar 1i4 (1 cement:4 coarse sand) and jolnting with grey cement slurry @ 3.3 kg/ sqm including grouiing the joinis with white cement and matchingigments etc, complete (Chapter No.14 S.I. No.22) 17 Providing and fixing water closet squatting pan (Odisa typeW.C. pan) with 100 mm Sand Cast lron P or S trap, 10litrelow level white P.V.C. flushing cistern, including flush pipe,manually controlled device (handle lever) conforming to lS: 7231, with all fittings and fixtures complete, includingcutting and making good the walls and floors whereverrequired: White Vitreous china Orissa pattern W.C. pan ofsize 580x440 mm with integral type foot rests (Chapter No.24 SI. No.1) 18 White Vitreous china Flat back wash basin size 550x400mm with single 15 mm C.P. brass pillartap(Chapter No.24 Si.No.5D) 19 Supply and hoisting of Sintex or equivalent high density polyethylene seamless of piece moulded tanks and placing the same in proper position including all taxes, labour and T&P etc. for proper completion of work. Tank should be ISI marked, Sintex or equivalent. (19-Chapter Sr.No.2) 20 Supply and lowering of 110 mm dia 6 kg/cm2 PVC pipe (Phenolex or apb by E/I) all complete. (I.S.I. Mark only)(Chapter No.23 SI.No. 32(C)) 21 Providing and Fixing PVC pipe conforming to ISI make working pressure 6 kg/Cm including testing labour T&P etc. all complete.140mmdiameter. (Chapter No.23 SI.No. 32(D)) 22 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings i/c fixingthe pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings, with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in-Charge,concealed work, including cutting chases and making good the wall etc. (d) 25mm nominal outer dia pipes.(Chapter No.23 SI.No.2C) 23 Providlng and fixing C.P. brass bib cock of approved qualityconforming to lS:8931. (Chapter No.23 Si.No.19) 24 Providing and fixing brass stop cock of approved quality (Chapter No.23 Si.No.7b) 20mm. 25 Supply and Fixing of Light Fitting Switch Board. (None Sheduled) 26 Supply and Fixing Wiring of Light Point. (None Sheduled) 27 S/L/J of 20mm dia PVC Cunduct Pipe etc. all complete. 28 Supply & Fixing of wiring Sub Main. 29 Supply & Fixing of Plug Point 15mm. 30 Lettering & Painting of wall etc. all complete. 31 Supply & Fixing of 27watt. CFL etc. all complete. 32 Cartage of Ballast, Kankar, Coal, Grit or Sand etc, including loading and unloading but excluding stackings on pucca roads.(Chapter No.3Si.No.8)8km. 33 Carriage of material by head load upto 90 meter distance etc. all complete.(Chapter No.3Si.No.1.1(i)) 34 Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) 35 Constructing brick masonary chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement: 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg). R.C.C. top slab with 1:2:4 mix (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement: 5 fine sand: 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement: 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: . (a) Inside dimensions 455x610 mm and 45 cm deep for single pipe line: With common burnt clay F.P.S. (non modular) bricks of class designation M-150{Chapter No.25 Si.No.8) 36 Providing and applying putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. including curing the cost of all material, labour, T&P etc. complete (15-Chapter Si.No.22) 37 Providing & Fixing 1.00mm thick decorative high pressure laminated sheet of plain / wood grain in gloss / matt / suede finish with high density protective surface layer and reverse shadeof adhesive bonding quantity conforming to lS : 2046 Type S, including cost of adhesive of approved quality. (l.50mmhick)(Chapter No. 9 S.I. No.2) 38 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC)pipes, having thermal stability for hot & cold water supply,including all CPVC plain & brass threaded fittings i/c fixingthe pipe with clamps at 1.00 m spacing. This includesjointing of pipes & fittings, with one step CPVC solventcement and the cost of cutting chases and making good thesame including testing of joints complete as per direction ofEngineer-in-Charge, concealed work, including cutting chases and making good the wall etc (A)15mm nominal outer dia pipes. (Chapter No.23 Si.No.2) 39 Making ornamental painting with special design make by specialist painter laying of two coat birla white putty and design by asian paint including all material etc. all complete. (NN Approved) 40 Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (2 cm. Nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors. (5-Chapter S.I.NO6) 41 Providlng and laying Polished Granite ,et Black stone flooring in req0ired design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry andm pointing with white cement slurry admi)ied withigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. (14-Chapter S.I.NO 27) 42 Sub Total (A) 43 Add/Deduction Rs. For Estimate Figure Amount Match 44 Grand Total