|
| 1 | SCHEDULE ‘A’ PART - I (Repair of Air Conditioner) |
| 2 | M & L for Gas refilling and charging of R-22 refrigerant tothe 1.50Ton capacity Split type AC,including testing of leak the complete system as specified and as per direction of Engineer - in - Charge. |
| 3 | M & L for Gas refilling and charging of R-22 refrigerant tothe 2Ton capacity Split type AC,including testing of leak the complete system as specified and as per direction of Engineer - in - Charge. |
| 4 | M & L for Gas refilling and charging of R-22 refrigerant tothe 1.5Ton capacity Window Type AC,including testing of leak the complete system as specified and as per direction of Engineer - in - Charge. |
| 5 | M & L for Gas refilling and charging of R- 32 refrigerant tothe 1.5 ton capacity Split Type AC, including testing of leak the complete system as specified and as per direction of Engineer - in - Charge. |
| 6 | M & L for Gas refilling and charging of R- 32 refrigerant tothe 2 ton capacity Split Type AC, including testing of leak the complete system as specified and as per direction of Engineer - in - Charge. |
| 7 | Dismantling, Taking down carefully from the installed position and re installing in its original position and testing on completion of proper servicing complete all as directed by the Engineer – in – Charge of1.5 Ton capacity Split type AC. |
| 8 | Dismantling, Taking down carefully from the installed position and re installing in its original position and testing on completion of proper servicing complete all as directed by the Engineer – in – Charge of2 Ton capacity Split type AC. |
| 9 | Disconnect and remove unserviceable main PCB/display PCB and Supply and fixing New main PCB/display PCB suitable for existing modelfor 1.5Ton capacity Split type AC (Display PCB) AC complete all as specified and as per direction of Engineer – in – Charge. |
| 10 | Disconnect and remove unserviceable main PCB/display PCB and Supply and fixing New main PCB/display PCB suitable for existing modelfor 1.5Ton capacity Split type AC (Inverter type) AC complete all as specified and as per direction of Engineer – in – Charge. |
| 11 | Disconnect and remove unserviceable main PCB/display PCB and Supply and fixing New main PCB/display PCB suitable for existing modelfor 2 Ton capacity Split type AC (Display PCB) AC complete all as specified and as per direction of Engineer – in – Charge. |
| 12 | Disconnect and remove unserviceable main PCB/display PCB and Supply and fixing New main PCB/display PCB suitable for existing modelfor 2Ton capacity Split type AC (Inverter type) AC complete all as specified and as per direction of Engineer – in – Charge. |
| 13 | Disconnect and remove unserviceable main PCB/display PCB and Supply and fixing New main PCB/display PCB suitable for existing modelfor 1.5 Ton capacity Window Type AC (Display PCB) AC complete all as specified and as per direction of Engineer – in – Charge. |
| 14 | Disconnect and repair of main PCB/display PCB and re fixing of repaired main PCB/display PCB suitable for 1.5Ton capacity Split type AC (Display PCB)complete all as specified and as per direction of Engineer – in – Charge |
| 15 | Disconnect and repair of main PCB/display PCB and re fixing of repaired main PCB/display PCB suitable for 2Ton capacity Split type AC (Display PCB)complete all as specified and as per direction of Engineer – in – Charge |
| 16 | Disconnect and repair of main PCB/display PCB and re fixing of repaired main PCB/display PCB suitable for 1.5Ton capacity Window Type AC (Display PCB)complete all as specified and as per direction of Engineer – in – Charge |
| 17 | Taking out the burnt fan motor from the 1.50Ton capacity Split type AC and supply and fixing new fan motor suitable for existing model complete all as specified and as per direction of Engineer – in – Charge |
| 18 | Taking out the burnt fan motor from the 2Ton capacity Split type AC and supply and fixing new fan motor suitable for existing model complete all as specified and as per direction of Engineer – in – Charge |
| 19 | Taking out the burnt fan motor from the 1.50Ton capacity Window Type AC and supply and fixing new fan motor suitable for existing model complete all as specified and as per direction of Engineer – in – Charge |
| 20 | Taking down unserviceable blower motor (for Indoor unit) of 1.50Ton capacity Split type AC and supply and fixing new blower motor suitable for existing model of indoor unit of split type AC, including necessary connections and testing on completion complete all as specified and as per direction of Engineer – in – Charge. |
| 21 | Taking down unserviceable blower motor (for Indoor unit) of 2Ton capacity Split type AC and supply and fixing new blower motor suitable for existing model of indoor unit of split type AC, including necessary connections and testing on completion complete all as specified and as per direction of Engineer – in – Charge. |
| 22 | Taking down unserviceable swing motor of 1.5 ton/2 ton capacities split type AC and supply and fixing new swing motor suitable for existing model of indoor unit of split type AC including necessary connections and testing on completion complete all as specified and as per direction of Engineer – in – Charge. |
| 23 | Taking down unserviceable capacitor from Split type/Window type AC and supply and fixing New Capacitor (50/55 MFD) , including testing on completion etc complete all as specified and as per direction of Engineer – in – Charge. |
| 24 | Taking down unserviceable capacitor from Split type/Window type AC and supply and fixing New Capacitor (60 MFD) , including testing on completion etc complete all as specified and as per direction of Engineer – in – Charge. |
| 25 | Disconnect and remove unserviceable 1.50Ton capacity Split type AC compressor and Supply and fixing of new rotary/reciprocating compressor including brazing the suction/discharge lines suitable for existing model following capacity ACs and testing on all as specified and as per direction of Engineer – in – Charge |
| 26 | Supply and fixing on Wall MS factory made pre painted bracket for Out door Unit fixed with Nut bolt/ Screw. |
| 27 | Supply and fixing of copper gas pipe ½” nominal bore |
| 28 | Supply and fixing of copper liquid pipe ¼ ” nominal bore |
| 29 | Providing and fixing 20 mm nominal dia CPVC pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge for Internal work, Exposed on wall |